Keynotes: Axial Capacity Of Drilled Foundations In Soft Rocks And Intermediate Geomaterials - Presentation Notes
By Michael W. Neill, O&apos
This presentation addresses some of the problems encountered in estimating the capacity of drilled shafts and augered, cast-in-place piles in soft rock. Methods to quantify side and base resistance ar
Jan 1, 2001
-
Kinematic Load Tests On A Model Pile In Clay
By Michael J. Brown
Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and
Jan 1, 2002
-
Kinematic Response Characteristics of a Piled Raft Foundation
By Ramon Varghese, A. Boominathan, Subhadeep Banerjee
Pile raft foundation system has been accepted as an economic foundation design for high rises and heavily loaded structures. Seismic response analysis of PR foundation systems involves complex pile-so
Jan 1, 2018
-
King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement
By Clif Kettle
The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified
Jan 1, 2008
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist
By James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Kosciuszko Bridge Main Pylon Deep Foundation Solution
By A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Laboratory Mixing and Testing for Controlled Waste Disposal Site
By Tomohiro Yamasaki
"At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand
Jan 1, 2015
-
Laboratory Modeling of Internal Erosion in Dam Foundations
By Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene
"Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l
Jan 1, 2016
-
Laboratory Study on Creep Behavior of Chemically Stabilised Soft Soils under Unconfined Conditions
By Venda Oliveira P. J., Correia A. A. S., Danisi C. M.
"AbstractA laboratory study has been undertaken to establish common understanding of the creep phenomenon of a Portuguese soft soil chemically stabilised with binders. In order to study the effect of
Jan 1, 2014
-
Laboratory Validation Of In-Situ Tests - 1. Introduction
This paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
Ladies And Gentlemen,
By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes
By John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium
By Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.
By M. Cornelius
Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of
Jan 1, 1999
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples
By J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989
-
Large Diameter Helical Piles for Refinery Expansion
By Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Large Diameter Machine Bored Piles In Australia
By W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue
By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay Bridge
By Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis
By A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996