Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Bore Pile Stabilization Issues in Offshore Marine Works

    By Nuno Cruz, Saúl Rodríguez

    "When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work

    Jan 1, 2017

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • DFI
    Borehole Loading Test Using A Self-Boring Instrument ? Synopsis

    By H. Mori

    This paper describes a new borehole loading test using a self-boring instrument appropriate for dense sandy soils and stiff clayey soils. The results of loading tests for the bearing strata of deep fo

    Jan 1, 2010

  • DFI
    Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations

    By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse

    This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1

  • DFI
    Brickworks Marketplace Ground Improvement, Adelaide

    By Andrew Middleton, Mark Wyatt

    "The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with

    Jan 1, 1900

  • DFI
    Bridge Pier Remediation, New London CT

    By Walter Kaeck

    In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign

    Jan 1, 2009

  • DFI
    Brightman Street Bridge Replacement Project

    By Arturo Ressi di Cervia

    Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc

    Jan 1, 2003

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Bring Your A-game! The Benefits Of Advocating For Advanced Geotechnical Exploration Methods

    By Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers

    Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Buckling Resistance of Steel Micropiles with Mechanical Splices

    By Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala

    "Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete

    Jan 1, 2014

  • DFI
    Building a Box in a Sponge: Excavation Support for a Tunnel

    By Matthew Meyer, Rosa Castro-krawiec, Charles Bartlett

    The PortMiami Tunnel project stands as an engineering milestone in Florida, marking the first large-diameter tunnel designed and constructed in the state. As we celebrate Deep Founda- tions Institute'

    Jan 1, 2012

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Building Class a Development Over Landfill

    By Omar Conte, Feng Lu, Roger A. Archabal

    The Sole Mia development is located in an area of North Miami, Florida currently undergoing revitalization that started in 2015. The overall site sits atop 184 acres of a former municipal waste landfi

    Oct 31, 2023

  • DFI
    Building Drilled Shafts to Bridge the Mississippi

    By Brian Koch

    Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled

    Jan 1, 2019

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003