Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Iron Ore Company of Canada ZV Concentrator: Flowsheet Description and Process DevelopmentBy G. Gagnon
"HistoryMining of the Schefferville iron deposits began in 1954 on completion of the 357 mile railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment o
Jan 1, 1981
-
MLA 34-81 - Mineral Investigation Of The La Panza Rare II Area (No. 5109), San Luis Obispo County, California ? SummaryBy Donald J. Barnes
Gold was found in samples collected from Pleistocene and Holocene stream and terrace deposits. Approximately 15,000 cu yd (11,400 cu m) of small and discontinuous terrace and stream gravel deposits in
Jan 1, 1981
-
Remedial Actions At Inactive Uranium Mill Tailings SitesBy Mark L. Matthews
In 1978, Congress enacted Public Law 95-604, the "Uranium Mill Tailings Radiation Control Act of 1978." The Act authorizes the Department of Energy to stabilize and control the tailings from designate
Jan 1, 1981
-
Environmental Condition And Impact Of Inactive Uranium MinesBy J. M. Hans, M. F. O’Connell, G. E. Eadie
INTRODUCTION The U.S. Environmental Protection Agency (EPA) was required, under Section 114(c) of Public Law 95-604, to provide a report to Congress identifying the location, and potential health,
Jan 1, 1981
-
Safety Precautions against Explosions in Collieries in West GermanyBy Scholl EW, Ricken W
The simultaneous presence of fuel, oxygen, and of an ignition source is necessary for an explosion to arise. If one of these conditions is missing an explosion cannot take place. A continuous reduct
Jan 1, 1981
-
Correction - Controls of Lead-Zinc Mineralization, Pine Point District, Northwest Territories, Canada – November, 1980, pp.1617 – Kyle, J. RichardBy J. Richard Kyle
On page 1617, the author's box was incorrect. It should have read: J. R. Kyle, member SME, is an assistant professor of geology. Dept. of Geological Sciences, The University of Texas at Austi
Jan 1, 1981
-
Ore Size, A Major Factor Affecting The In-Situ Uranium Acid Leaching - IntroductionBy Harry Wolf
The chemistry of the element uranium enables industry to employ either an acid or alkaline carbonate leach solution for most uranium ores. Either method my be used for conventional, in-situ, or heap l
Jan 1, 1981
-
Shortwall Mining In The US: A Record Of Failure And SuccessBy Duk-Won Park, Syd S. Peng
INTRODUCTION More than five years have elapsed since the first shortwall panel was installed in a US mine in 1972. By the latest count, 11 mines have tried the shortwall method on 34 panels. Po
Jan 1, 1981
-
Discussion of the previous paper (00f59929-c513-4252-b2d0-24b5bf3f97ad)By M. G. Spengler
Mr More O'Ferrall must be complimented on a paper that will be a useful reference for the re-working of previously abandoned workings. His paper so closely mirrors experiences at East Rand Propri
Jan 1, 1981
-
Surveying And Mapping (71a44a59-8813-4966-ae4b-8f72d54dd556)By Stephen E. Merritt, John W. Straton, T. Carl Shelton
Surveying and mapping are used to locate and visually portray objects, lines, or areas in relation to a reference point or line. The actual making of the measurements to locate the objects and points
Jan 1, 1981
-
RI 8619 Removal of Organic Contaminants From Aluminum Chloride SolutionsBy Jack C. White
The Bureau of Mines, in its efforts to insure the continued viability of the domestic minerals economy, has been engaged for several years in research on the extraction of alumina from domestic, nonba
Jan 1, 1981
-
RI 8613 Effect of Direct-Current Firing Levels on Detonator Delay TimesBy Karl R. Becker
Detonators representing a sampling of various domestic commercial delay detonators were fired at various direct-current (dc) firing levels. Results of firings using well-below-recommended firing level
Jan 1, 1981
-
Insuring Technical Credibility In The Future Of Small Mining ProjectsBy Christian F. Baiz
The author will present a discussion of the steps which must be taken by the prospective developer of a small mining operation to establish technical credibility when seeking financial backing. Partic
Jan 1, 1981
-
Upside Down Concrete Accelerates Large Tunnel ProjectBy George Joseph Malina
Contractor chose and Owner allowed concrete to be placed using the arch first principle while excavating the 35'-3" O.D. rock tunnel. The contract included excavating and lining 26,000 L.F. of ro
Jan 1, 1981
-
Longwall Development ProblemsBy Robert A. Stansbury
Keeping development ahead of retreat mining is a problem which occurs nearly everywhere longwall mining is used in the United States. As improved equipment technology has allowed the application of lo
Jan 1, 1981
-
IC 8871 A Computer Program For Calculating Thermodynamic Properties From Spectroscopic DataBy R. P. Beyer
A FORTW IV computer program has been written to calculate thermodynamic properties over a desired temperature range from spectroscopic data. This program computes heat capacities, enthalpies, and entr
Jan 1, 1981
-
Assessment Of Radiation Properties Of Hydraulic Backfills For Underground Uranium MinesBy Jacques H. Nantel, James F. Archibald
INTRODUCTION The use of backfill materials in underground mines has been practiced for many years and the trend indicates an increased utilization of backfill materials in the future. The authors b
Jan 1, 1981
-
Computerization Of Coal Preparation Plants ? 1. IntroductionBy G. C. Hambleton
There is sufficient indication of the existence of a basic misconception in the Coal Mining industry (on a world-wide basis) as to what computer control really does, what it costs, how it works and ho
Jan 1, 1981
-
Copper-Arsenic Separation with the Aid of Low-Melting SaltsBy A. Block-Bolten
Copper concentrates from northern Peru contain large amounts of arsenic and antimony in the form of sulfosalts like enargite, tennantite and tetrahedrite. These impurities affect up to 30% of Peruvian
Jan 1, 1981
-
Excavation And Support Of Underground Crusher Facility At Carr Fork MineBy N. S. P. Kumar
INTRODUCTION Development work at Carr Fork Mine of Anaconda Copper Company in Tooele, Utah commenced in August 1974. A decision to install an underground gyratory crusher for primary crushing run-o
Jan 1, 1981