Search Documents

Sort by

  • NIOSH
    OFR-149-81 Development Of An Explosion Proof High Voltage Cable Connector

    By H. E. Dresch

    This report summarizes the work accomplished under Bureau of Mines contract H0188068. The contract required design and construction of a high voltage (7.5 KV) explosion proof cable connector for use o

    Jan 1, 1981

  • NIOSH
    RI 8574 A Pyrometallurgical Method for Processing Ni-Cd Scrap Batteries

    By Donald A. Wilson

    As part of a continuing effort to maximize metal recovery from domestic secondary resources, the Bureau of Mines investigated a process for recovering the metallic portion of scrap alkaline batteries.

    Jan 1, 1981

  • SME
    Planning And Construction Of The Tohoku Shinkansen Ueno Shield Tunnel, Diameter Of 13M

    By Hisakazu Matsushita, Yoshio Yamaguchi

    INTRODUCTION Shinkansen, operating 1,176km between Tokyo and Hakata, transports 340,000 passengers a day. Presently, the 466km Tohoku Shinkansen linking Tokyo and Morioka and the 270km Jyoetsu Shin

    Jan 1, 1981

  • AIME
    Copper Recovery From Sulfide Concentrates Via Roast/Leach/Electrowinning

    By Dale C. Matthews, Donald L. Simpson

    Hecla Mining Company's Lakeshore Mine and Metallurgical complex near Casa Grande, Arizona, is the first plant in North America to utilize the roast/leach/electrowinning process for production of

    Jan 1, 1981

  • AIME
    Sub Level Open Stope Ventilation Design at Mount Isa

    By C. P. Melloy

    INTRODUCTION Ventilation practice at Isa Mine has been evolving since underground mining began in 1931. Much fundamental work has been conducted and reported regarding the primary ventilation syst

    Jan 1, 1981

  • CIM
    Hot gunning of TBRCs at Inco

    By P. M. Tyroler, W. J. Thoburn, M. R. Alberty

    "An initial test of this unique application demonstrated that hot gunned refractory would adhere satisfactorily. Subsequently, it was found that the proportion of material sticking during application

    Jan 1, 1981

  • RMCMI
    Morning Session Tuesday, June 30, 1981

    The session opened at 9:00 a.m. Presiding- Herman E. Knight, Vice President, The Pittsburg & Midway Coal Mining Co. and Gulf Mineral Resources Co., Denver, Colorado. The first speaker was Dale A. Ea

    Jan 1, 1981

  • AUSIMM
    Rehabilitation and Water Quality Control at Ohai Coalfields

    By K J. Thompson

    This paper describes the work which has been undertaken at the Ohai coalfields in Southland to restore overburden heaps during past opencast mining operations, and procedures which have been adopted t

    Jan 1, 1981

  • SME
    Development And Application Of The Krebs Solvent Extraction System

    By Alain A. Sonntag

    The MBS Solvent Extraction System utilises a unique design of mixer- settler having very high capacity per unit area and great flexibility. The development of the mixer-settler is traced through its v

    Jan 1, 1981

  • SME
    Histopathologic, Morphometric And Physiologic Investigation Of Lungs Of Dogs Exposed To Uranium Ore Dust

    By R. H. Busch, S. M. Loscutoff, F. T. Cross, R. E. Filipy, P. J. Mihalko, R. F. Palmer

    INTRODUCTION During the last decade, several studies in France (e.g., Perraud et al. , 1970; Chameaud et al., 1974, 1979 and 1980) and the United States (e.g., Stuart et al., 1978; Cross et al., 19

    Jan 1, 1981

  • SME
    Ventilation Cost Impact Of Reduced Radon-Daughter Working Levels (0ea0d462-1caf-498e-9c8b-1445f1c83818)

    By Robert C. Bates

    Published information on costs of radon-daughter control in uranium mines was analyzed to develop estimates of the cost per ton for any level of radiation exposure control. All data were converted to

    Jan 1, 1981

  • AIME
    Uranium Potential of Zeolites in Volcanically Derived Sediments, Northern Reese River Valley, Nevada

    By L. T. Larson, P. M. Basinski

    In the northern Reese River Valley uranium is corroded with Middle Pliocene zeolites. These zeolites were diagenetically derived from rhyolitic volcanic glass deposited in a saline- alkaline lake. X-r

    Jan 1, 1981

  • NIOSH
    RI 8580 Extracting Uranium From Carbonaceous Ores

    By L. E. Schultze

    As part of its goal of maintaining an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines devised a processing sequence for recovering uranium from carbonace

    Jan 1, 1981

  • NIOSH
    RI 8542 Three Bureau of Mines Optical Dust Probes

    By Kenneth L. Cashdollar

    This report describes three types of optical dust probes that have been designed, built, and tested by the Bureau of Mines. Each of the probes measures dust cloud concentrations by the attentuation of

    Jan 1, 1981

  • AIME
    Dust Control In Longwall Shearer Faces Through Air Movement By Water Sprays

    By Fred N. Kissell, Natesa I. Jayaraman

    Introduction This paper describes a recent Bureau of Mines research project that resulted in a simple procedure for reducing the dust exposure of longwall shearer operators. This project involved the

    Jan 1, 1981

  • AUSIMM
    Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western Australia

    By Morabito J, Harrop D. W

    Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the

    Jan 1, 1981

  • CIM
    Secondary alkali feldspars in porphyry systems (5df3adb1-c1f4-4346-a834-98a335583e98)

    By Craig H. B. Leitch

    "In describing the alteration of porphyry systems, the term ""secondary K-feldspar"" appears to be an oversimplification. A better term would be ""alkali feldspar"" alteration, because in actual fact

    Jan 1, 1981

  • SME
    The Development Of Methods To Optimize The Haulback Mining System In Single And Multiple Seam Contour Mines

    By Grant R. Brown

    The objective of this paper is to describe a study sponsored by the U.S. Department of Energy during which a model was developed to optimize haulback mining procedures in single and multiple seam cont

    Jan 1, 1981

  • SME
    Carrying Coal To The 21st Century: The ICG/Hoosier Energy Contract

    By Robert J. Neubauer

    I was asked here today to discuss the first long-term freight rate contract ever signed by a U.S. railroad and shipper. That was ICG's contract with the hoosier energy company to haul coal from s

    Jan 1, 1981

  • NIOSH
    OFR-146(2)-82 Sprayfan System - Results Of Mine Testing - Volume III

    By W. E. Schroeder

    Two underground installations of the sprayfan system are described and evaluated. The spray fan proves capable of reducing by 1300 percent downtime due to high methane. Spray fan face ventilation at 2

    Jan 1, 1981