Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Monitoring Method of the Condition of Slag-Cleaning Furnace in Mitsubishi ProcessBy Akira Kaneda
Mitsubishi continuous process employs an electric furnace for settling matte from slag. Electrodes are immersed into the slag layer in the slag-cleaning furnace and the temperature of the melt is main
Jan 1, 2001
-
Heap Leach Gold Production ModelingBy M. Irish, M. Jahraus
Accurate prediction of gold (or other metal) production from a heap leach operation is essential to the economic vitality of any such operation. However, this is also one of the most challenging issu
Jan 1, 2001
-
Formalised Blasting Rules: A Case-Specific ApproachBy D Nourry
Optimising the blast is a major issue in the blasting business. It generally means acting on the blasting pattern (drilling, charging, detonating) in order to get a given æresultÆ. This result may eit
Jan 1, 2001
-
Troubleshooting Flotation Cell Operation Using Gas Velocity MeasurementsBy Donald Leroux, Ralph Dahlke, Dave Scott, Finch. James A., Cesar O. Gomez
"The efficiency of the flotation process depends on how effectively air is dispersed into small bubbles. Bubble surface area flux - the surface area of bubbles per unit time per unit cross-section are
Jan 1, 2001
-
Technology Transfer to the Mining IndustryBy Ramamritham Sridhar, Vaikuntam I. Lakshmanan, Dan A. Macki
Historically, introducing new technology to the mining industry has been problematic. In general, the industry is reluctant to take risks with new technology because it is already heavily tied to risk
Jan 1, 2001
-
Computational Modeling of Heat Mass and Solute Transport in Directional Solidification ProcessesBy M. El Ganaoui, P. Bontoux
"A computational model to investigate solid/liquid phase change transitions for binary alloy under directional solidification is presented. Conservation equations are developed by using an homogeneous
Jan 1, 2001
-
New Concepts in Mine Backfill TrainingBy James F. Archibald, Ferri Hassani, Jacques Nantel, David O. DeGagné
Operators depend upon the success of backfilling programs to ensure that mine activities run continuously (Archibald et al, 1993) where backfilling is an integral part of the mining cycle. In order to
Jan 1, 2001
-
Methods for Approximating Discontinuous or Rapidly Changing Conductivity in Numerical Calculations.By Vaughan R. Voller
"Numerical methods for dealing with a temperature dependent conductivity are discussed. An approach based on a local application of a Kirchhoff transformation at the discrete level is presented. The a
Jan 1, 2001
-
Interaction Between Wall Rock Closure, Cemented Backfill Load, and Reinforcement Bolt Load in an Underhand Stope at the Lucky Friday MineBy D. Denton, C. Peppin, D. Tesarik, D. Bayer, J. B. Seymour
Hecla Mining Company and NIOSH cooperated in a study to document the safety of rock support supplied by reinforced cemented paste backfill at the Lucky Friday Mine. Data are presented on backfill modu
Jan 1, 2001
-
Unlocking the Wealth From Benefit Sharing in Drill and BlastBy Lawrie Logan, Mike Wiggin
This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen
Jan 1, 2001
-
Plastics From Shredder Residue: Pilot Plant Experiences And DataBy S. Christiansen, G. R. Winslow, R. W. Kobler
Todays End of Life vehicles are shredded and their metal components recovered and recycled by standard methods. The remaining non-metallic fraction is shredder residue, and contains vast amounts of hi
Jan 1, 2001
-
Hydrothermal Sulfide Deposits In LakesBy Sophia Katsouri
Hydrothermal circulation that produces sulfide deposits in the marine environment can also produce sulfide deposits in lakes. The major differences in terms of process are (1) in lakes the hydrotherma
Jan 1, 2001
-
Concreting the Queens Tunnel, New York City Water Tunnel No.3By Edward M. Dowey
The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring
Jan 1, 2001
-
Model for Calculating the Lankford Value in Sheet SteelsBy C. Isaac Garcia, Sihai Jiao, Anthony J. DeArdo
"A practical model based on the Hill analysis has been developed to calculate the Lankford value of interstitial free (IF) steels and its distribution in different rolling directions, by considering o
Jan 1, 2001
-
Geology of the Palladium-rich Legris Lake Mafic-Ultramafic Complex, Western Wabigoon Subprovince, Northwestern OntarioBy Kéiko H. Hattori, Neil T. Pettigrew
"Abstract- The Legris Lake Complex is a northeast-trending, 7.3 km long by 3.5 km wide, maficultramafic intrusive complex located in the western Wabigoon Subprovince of the Archean Superior Province.
Jan 1, 2001
-
Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in SingaporeBy K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai
The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa
Jan 1, 2001
-
Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced ShotcreteRecently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate
Jan 1, 2001
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua
Jan 1, 2001
-
Commissioning Under a Microscope ù The Cawse Nickel Start-UpBy R Young, D OÆSullivan
When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj
Jan 1, 2001
-
Ore Treatment at Martha Current Operations and Future DirectionsThe treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t
Jan 1, 2001