Search Documents

Sort by

  • CIM
    Mine Laronde ? Expansion ? 4500 Tonnes Par Jour

    By Paul-Henri Girard

    La Mine Agnico-Eagle division Laronde situé à Cadillac, est un producteur d?or, d?argent, de cuivre et de zinc. Cette propriété est situé dans les cantons Bousquet-Cadillac le long d?une des ceintures

    May 1, 2001

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Quality Assessment/Quality Control (QA/QC) for Resource Estimation at Inco Technical Services Limited

    By Christopher R. Davis

    Resource modelling is the basis for any economic appraisal of a mining project and includes a number of steps from data acquisition and validation to resource reporting and classification. At each s

    May 1, 2001

  • CIM
    Modeling the Flow of Information in Mine Maintenance Systems

    By M. G. Lipsett

    One challenge in applying information technologies in Mining is building a business case. In Mine Maintenance, there is a complex flow of information that contributes to making informed business decis

    May 1, 2001

  • CIM
    Rock Mass Response to Mining Induced Over-Stresses in a Sublevel Caving Operation Case Study at the Kiruna Mine, Sweden

    By Emmanuel Henry

    The Kiruna Mine, operated by Luossavaara-Kiirunavaara AB (LKAB), is a large-scale sublevel caving operation located in Arctic Sweden. Iron ore is extracted at a rate of 60 000 tpd from a four-kilometr

    May 1, 2001

  • CIM
    Peru Minerals and Metals Public Sector Assistance Project Ministerio de Energía Y Minas del Peru - Canadian International Development Agency - British Columbia Ministry of Energy and Mines

    By Jamie W. Pardy

    The objective of the Canadian International Development Agency program is to facilitate the efforts of the people of developing countries to achieve self-sustainable economic and social development in

    May 1, 2001

  • CIM
    Zero-Process-Ignorance in the Comminution Circuits, Why Not?

    By A. Bouajila1

    Minerals processing organisations will be more and more under intense competitive pressure. Major changes are being experienced with intense respect to resources, processes, production strategies and

    May 1, 2001

  • CIM
    Valuing Multi-Zone Deposits with Modern Asset Pricing (Real Options) Techniques

    By Michael Samis

    Conventional project valuation techniques, such as discounted cash flow (DCF) method, are more frequently being criticised for the manner in which they consider the interacting effects of uncertainty

    May 1, 2001

  • CIM
    Exploration Drilling Internationally

    By Loris S. Pascoli

    The increased pace of globalization in the mining industry has presented more opportunities for Canadian service companies to participate in ventures abroad. However, varying cultures, laws, competiti

    May 1, 2001

  • CIM
    Applications of Conditional Simulations to Assess Resource Classification Schemes

    By Mario E. Rossi

    Geostatistical conditional simulations are becoming increasingly popular as tools that provide models of uncertainty at different stages of a mining project. They have been used as grade control tools

    May 1, 2001

  • CIM
    Assessment of Wall Control Blasting Practices at the Ekati? Diamond Mine

    By J. Peterson

    A review of blast designs and improved blasting practices at the Ekati??Diamond Mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inves

    May 1, 2001

  • CIM
    Twin Mining?s Diamond Discoveries in Canada?s Arctic

    By Hermann A. Derbuch

    Twin Mining made a conscious decision when it changed from gold mine explorer and developer to become a diamond explorer in Canada?s Arctic. It was a decision of survival in an environment that saw ju

    May 1, 2001

  • CIM
    The POP Project (Process Optimization Project) Development and Transfer of Modern Optimization & Control Tools and Methods for Mineralurgical and Metallurgical Processes

    By S. Caron

    From the early 70?s, ?Centre de Recherche Minérale? (CRM) has conducted and co-ordinated Research and Development activities for the mineralurgical and metallurgical industries. Since 1999, CRM has co

    May 1, 2001

  • CIM
    Deep Shaft Hoisting at Laronde - The Penna Shaft Hoisting Plant

    By Bennett McLaughlin

    AGNICO-EAGLE started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1,800 tonnes per day from a 2,240 metre deep shaft. Exploration success lead to the installation of a hoi

    May 1, 2001

  • NIOSH
    Technology News - No. 489 - Reducing the Danger of Explosions in Sealed Areas (Gobs) in Mines

    Objective To identify techniques to reduce the probability of gob gas explosions. Background In the last 6 years, seven explosions of methane and/or coal dust occurred within worked-out, seal

    May 1, 2001

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • CIM
    Life-Cycle Assessment: Its use in the Mining Industry of the Future

    By Mary Jean Buchanan

    The last twenty years have seen the advent of environmental concerns and sustainable development, and the industry has witnessed the rise of Environmental Management Systems and their registration thr

    May 1, 2001

  • CIM
    The Design of Advanced Clean Coal Technologies: Where are we and Where are we Heading?

    By Nancy C. Mohn

    ?Even though the age of many existing coal units exceeds 30 years, these units continue to perform with excellent reliability and at a competitive cost with other fossil fuel units. ?NERC data shows

    May 1, 2001

  • CIM
    Transporteur Multi-Fonctionnel Pour Forage

    By Marcel Labbé

    La largeur de l?armature peut être modifiée selon les besoins du client entre 48 " et 64" de largeur totale, donc 2 sections de 24" à 32". Ceci permet à l?opérateur d?effectuer le démantèlement de l?é

    May 1, 2001

  • CIM
    Fragmentation a Vital Link in the Drill to Mill Process Information System

    By John Hansen

    This paper has been written for presentation at the 103rd Annual General Meeting of the Canadian Institute of Mining, Metallurgy, and Petroleum, April 29 to May 02, 2000. The paper addresses blast pat

    May 1, 2001