Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 10
- File Size:
- 484 KB
- Publication Date:
- May 1, 2001
Abstract
A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A description of the project geology, plant set up as well as exploitation results, including productivity and profitability curves, are given for a small scale mining operation in comparison with larger ones. Copyright ã 2001 CIM
Citation
APA:
(2001) Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, QuebecMLA: Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec. Canadian Institute of Mining, Metallurgy and Petroleum, 2001.