Search Documents

Sort by

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010

  • TMS
    Optimisation Of The Anode Sector At Norddeutsche Affinerie

    By Torben L. Edens

    Norddeutsche Affinerie is the largest copper producer in Europe. Two sites are in operation for the production of refined copper: primary copper production is located in Hamburg and secondary copper p

    Jan 1, 2006

  • IMPC
    Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive Sensor

    The ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att

    Sep 1, 2012

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009

  • TMS
    Optimisation of the Leach Conditions for a Copper/Uranium Ore

    By S. J. Macnaughton

    The Olympic Dam deposit in South Australia contains 2% copper and 0.06% uranium, which are present as bomite, chalcocite, chalcopyrite, uraninite, coffinite and brannerite. The copper is principally r

    Jan 1, 1999

  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules

    Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules

    Sep 13, 2010

  • TMS
    Optimisation Of The Phosphate Nokes Process At The El Teniente By-Product Molybdenite Plant

    By S. H. Castro

    The El Teniente molybdenite plant (Chile), with a nominal capacity of 3,200 tpd of bulk Cu-Mo concentrate, produced approximately 3,385 metric tonnes of Mo during 1998 by using the phosphate Nokes pro

    Jan 1, 1999

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • CIM
    Optimisation of the Prominent Hill SAG Mill

    By Mark Weidenbach

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff)

    By Brett Triffett, Mark Weidenbach, Christopher Treloar

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • AUSIMM
    Optimised Process Control in Iron Ore via Online Analysis of Light Elements

    By L Köresaar, J Moilanen

    With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia

    Jul 13, 2015

  • AUSIMM
    Optimising a Combined Open Pit and Underground Strategic Plan

    By M Maulen, K van Olden, T Elkington

    A large open pit is planned at the site of an existing underground mine. Strategic planning work has been undertaken to investigate the project value associated with an expansion of underground operat

    Jan 1, 2009