Abstract

OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a thirty four foot ThyssenKrupp Polysius mill followed by a twenty four foot Polysius ball mill in closed circuit with hydro cyclones, designed for an ore throughput of eight million tonnes per annum. The main aspects of designing the circuit are discussed along with the issues faced in the early stages of operation. A review of the optimization strategy applied to the milling circuit such as cyclone optimization, advanced process control strategy implementation and reline management to improve availability is then discussed highlighting areas of significant process improvement that have seen the plant exceed nameplate throughputs above nine million tonnes per annum.
Citation

APA: Mark Weidenbach Brett Triffett Christopher Treloar  (2012)  Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff)

MLA: Mark Weidenbach Brett Triffett Christopher Treloar Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff). Canadian Institute of Mining, Metallurgy and Petroleum, 2012.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account