Search Documents

Sort by

  • AUSIMM
    Fan specification and tender adjudication for mine ventilation engineers with particular reference to turnkey projects

    By D J. Brake

    The correct specification and then selection of primary or major fans for an underground mine is a critical decision not only in terms of fan capital and operating costs, but also safety and reliabili

    Aug 28, 2017

  • SME
    Fan Stall And Multiple Operating Points In Multiple-Fan Ventilation Systems

    By N. P. Reddy, Y. J. Wang

    Stall or aerodynamic stall of axial flow fans has long been recognized as an important operational problem in mine ventilation. To develop a technique for characterizing fan stall in multiple fan vent

    Jan 1, 1993

  • SME
    Fan Stall And Multiple Operating Points In Multiple-Fan Ventilation Systems (845c948b-5ed5-4f84-af0f-8c01f7ddc63e)

    By Y. J. Wang

    Stall or aerodynamic stall of axial-flow fans has long been recognized as an important operational problem in mine ventilation. To develop a technique for characterizing fan stall in multiple-fan vent

    Jan 1, 1991

  • CIM
    Fan Type Most Suited for a Particular Ventilation Application

    By K. A. Mackinnon

    The choice of fan type (axial flow, centrifugal or mixed flow) most suited for a mine ventilation application depends on a number of technical and economic factors. For each project, the relative impo

    Aug 1, 2013

  • SAIMM
    Fan-Structure Shear Rupture Mechanism as a Source of Shear Rupture Rockbursts

    By B. G. Tarasov

    This paper proposes the further development of a recently identified shear rupture mechanism (fan mechanism) that elucidates a paradoxical feature of hard rocks ? the possibility of shear rupture prop

    Jan 1, 2014

  • TMS
    Far From Equilibrium Processing of Light Metals

    By F. H. (Sam) Froes, C. Suryanarayana, K. C. Russell, C. M. Ward-Close

    "Far from equilibrium synthesis allows development of novel crystal structures and microstructures, leading to achievement of enhanced physical and mechanical properties. A number of ""far from equili

    Jan 1, 1994

  • AUSIMM
    Far Southeast-Lepanto Porphyry-Epithermal Cu-Au Deposits, Philippines: Coupled Hydrothermal Processes Between the Porphyry and High-Sulphidation Environments

    The spatial and temporal evolution from the porphyry to high-sulphidation epithermal environment can be assessed by integrating new results on such deposits (Arribas et al, 1995; Hedenquist et al, 199

    Jan 1, 1999

  • ISEE
    Farmers Catalog, How to Remove Stumps with Du Pont High Explosives

    By Robert Hopler

    In issuing this pamphlet on stump and boulder blasting for the use of farmers, we wish to call attention to the fact that Du Pont High Explosives have been used with universal satisfaction for many ye

    Jan 1, 2008

  • AUSIMM
    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Sep 13, 2010

  • CIM
    Fast Analysis of Washability Parameters for Process Control

    By Helge B. Wurst, Michael P. Cipold, Jan F. Bachmann, Claus C. Bachmann

    "In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink-float

    Jan 1, 2016

  • AUSIMM
    Fast and Efficient Procedures for Stability Analysis Using Generalised Limit Equilibrium Method

    By Arit I, Adisoma G

    General Limit Equilibrium Method (GLE) and Janbu's Generalised Procedure of Slices (GPS) are two limit equilibrium methods in slope stability analysis which satisfy all equilibrium conditions.

    Jan 1, 1998

  • SAIMM
    Fast Data Capture for Crusher Modelling and Optimisation

    By J. D. Salter

    Most diamonds are liberated from their ores by crushing. Diamond and other coarse grained mineral ores require carefully optimised crushing circuits. Recent advances in computer technology have made p

    Jan 1, 1987

  • NIOSH
    Fast Monitoring Of Mine Waste Embankments - Objective

    Rapidly identify unstable mine waste embankments and similar dam structures. Approach Aerial photography, geotechnical instrumentation, and telephone or satellite data transmission are used to

    Jan 1, 1979

  • SME
    Fast Multidimensional Interpolations

    By Peter Hornby, Maurice Craig, Franklin G. Horowitz, Don Bone

    We have developed a high-performance, flexible scheme for interpolating multi-dimensional data. The technique can reproduce exactly the results obtained, for example, from Ordinary Kriging and related

    Jan 1, 1996

  • CIM
    Fast PB Process: Plating Lead at 10,000 A/M2

    By M. Maccagni, J. Nielsen

    "The recovery of lead from battery paste has been investigated for a long time and with the use of many different electrolytes. A number of processes have been presented, but none of them reached even

    Jan 1, 2016

  • SME
    Fast Rock Segmentation Using Artificial Intelligence

    By S. Tafazoli, D. Cooper, I. Bell, S. Nouranian, B. Sameti, M. Ramezani

    "Image-based rock fragmentation sensing in mines and quarries includes an important rock boundary delineation step, commonly referred to as rock segmentation. This paper presents an artificial intelli

    Jan 1, 2018

  • SME
    Fast track construction at Asamera’s Cannon gold mine - a case study

    By Donald C. Moore

    Introduction Asamera Minerals (US) Inc. and its joint venture partner, Breakwater Resources Ltd., discovered ore grade gold mineralization on their 20 km2 (5000 acre) Wenatchee, WA land position in F

    Jan 2, 1989

  • SME
    Fast Track Construction Project -A Case Study

    By D. C. Moore

    The decision to proceed on a "fast track" construction project is not" without risks as well as rewards. An understanding of some of the risks prior to start of the project will maximize the rewards.

    Jan 1, 1988

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006

  • SME
    Fast Tunneling With Drill & Blast Tunnel and Shaft Construction at the Sixth Water Aqueduct

    By Bruce McKinstry

    INTRODUCTION In June of 1992, the Bureau of Reclamation, United States Department of the Interior, awarded the contract for construction of the Sixth Water Aqueduct to the Fedrick-Redpath Joint Ventu

    Jan 1, 1995