Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Load Testing DeviceBy Jorj O. Osterberg
This paper is for presentation at the 14th Annual Members Conference of the Deep Foundations Institute held at the Hyatt Regency Hotel, Baltimore Maryland on October 10, 1989. This is an introduct
Jan 1, 1989
-
New Locked Charge Protection System Prevents Damage To 14mw Geared MillBy H De Beer
The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres
Nov 1, 2011
-
New Locked Charge Protection System Prevents Damage to 14MW Geared Mill (7b868bde-460b-4446-94f2-2b070ebb2f1b)By P. van Zyl, M. Lombaard
The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres
Jan 1, 2012
-
New Locked Charge Protection System Prevents Damage to 14mw Geared Mill (e36f627b-5857-4b5e-9b18-31db39c538e3)The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres
Jan 1, 2012
-
New longwall plow system achieves high production at low coal seam"Caterpillar has developed the Cat GH800B longwall plow system, designed for mining very low coal seams at high rates. Building on the attributes of the proven GH1600 plow system, the Caterpillar long
Jan 1, 2014
-
New Look At Long-Term Anchorage: Key To Roof Bolt EfficiencyBy Robert Stefanko
Roof bolting in coal mines has progressed very rapidly in the last decade, and today this method of support is in general use. There are many theories concerning the functions of roof bolts, but the i
Jan 5, 1962
-
New Look at the Small GasifierBy R. W. Culbertson, S. Kasper
During the 1920's, approximately 11,000 small gasifiers were in operation in the United States. They converted about 15 million tons (13.6 Mt) of coal per year into low Btu gas. In some cases, ho
Jan 1, 1980
-
New look at underground coal mine safetyBy E. M. Spokes
Starting in 1980, a committee of the National Research Council studied the question of why some underground coal mines are safer than others and what could be done to improve the ones with poorer perf
Jan 1, 1987
-
New look at underground coal mine safety (90f3020e-d204-4f4d-a231-c9d77ad90130)By E. M. - Technical Papers Spokes
A.B. Rushton The work and resulting publications of the Committee on Underground Coal Mine Safety and The President's Commission on Coal were appropriate at the time of publication. The statist
Jan 1, 1987
-
New look into quantitative analysis of mine safety studiesBy J. Maiti, A. Bhattacherjee
A literature review on quantitative analysis of mine safely studies revealed that numerous investigators explored a wide- range of techniques, including the investigation of bivariate and multivariate
Jan 1, 2000
-
New Machine-Mounted Dust Collector System For Continuous Mining Machines - ObjectiveCapture airborne coal dust generated by a continuous mining machine to reduce workers? dust exposure and to improve face visibility. Approach Develop a low-profile dust collector system which ca
Jan 1, 1983
-
New Mapping Technologies for Tunnel InspectionsBy Chris Laughton, Bernhard Spoerr
"Tunnel inspections are increasingly needed to ensure that aging infrastructure does not fail in service. To this end the time between inspections is being reduced, the thoroughness of each inspection
Jan 1, 2016
-
New Markets and the Environment: Challenges Facing the Lead-Zinc IndustryThe Lead-Line Update held in conjunction with the 1977 SME-AIME Fall Meeting in St. Louis provided sessions on mining, mineral processing, extractive metallurgy, and economies to brief the record on t
Jan 11, 1977
-
New Material Handling System For Heap Leach Stack ConstructionBy M. L. Clark
Advances in the recovery of gold from heap leaching are being made daily, but of all the systems vital to the maximum recovery of gold from a leach pile, none is more important than the methods used t
Jan 1, 1988
-
New Materials Technology Applied in Longwall MiningCoal slurry pumping was introduced into the U.K. in 1973. Gateside packs were prepared in areas of containment using R.O.M. coal and a special fast setting cement. The packs restricted roadway con
Jan 1, 1986
-
New Measurement System On Continuous Casting Tundishes At Steel Of West Virginia Provides True Steel Running Level And Increases Yield By Accurate Drain ControlBy Mark Gilliam
Control of true steel level in the tundish during casting is desired in order to maintain the correct pressure head and thus provide a stable flow to the mold. Also the control of tundish draining pre
Aug 16, 2017
-
New Mechanism of Coal Mine Slope FailureBy K. N. Karparov
?Two highwall failures in a South African coal mine defied analysis by widely accepted limit equilibrium methods. ?The geological conditions were complex, with undulating coal-bearing strata overlyin
May 1, 2007
-
New Members[Arsulich, Thomas Mechanical Engineer, S.A.E. House, Laramie, Wyoming Barrett, A. Lee joy Mfg., Co., Research Engineer, Franklin, Pa. Bartlett, Rulon Salesman, 265 S. Seventh East, Salt Lake City
Jan 1, 1950
-
New Members.By AIME AIME
The Following List Comprises The Names Of Those Persons Elected As Members Or Associates, Who Accepted Election During May And June, 1908 MEMBERS. William H. Bainbridge Searchlight, Nev. William N.
Jan 7, 1908
-
New method allows for anchorage checkfor rock boltsBy Gene Mattila, Ron Boyd
Introduction Rock bolting is a general term that encompasses pinning, roof bolting, rib bolting, and cable bolting. Rock bolting contributes the highest nonproductive cost and is the most significant
Jan 4, 1985