Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel
By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm Sinkhole
By Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project
By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a
Jan 1, 2003
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build: Elevating Partnering to a Higher Level
By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Design/Build Agreement For The Niagara Tunnel Project
By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Designing a final wall blast to improve stability
By J. P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1987
-
Designing A Final Wall Blast To Improve Stability (PRIPRINT 86-50)
By James P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1986
-
Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)
By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini
Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar
May 3, 2021
-
Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024
By Sean Warren, JOSEF BOURGEOIS
The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute
Feb 1, 2024
-
Designing An Information Management System For Mineral Processing Plants
By G. A. Kosick, L. Kuehn
The design of an information management system (IMS) for a mineral processing plant requires prior consideration of many factors, which can be broadly categorized into two domains, process plant consi
Jan 1, 1993
-
Designing An Oil Shale Mine Ventilation System ? Introduction
By Floyd C. Bossard
In underground mining operations, the over- riding issue has to be protection of worker health and safety. The employees underground, making a living in a dangerous occupation, know these are major is
Jan 1, 1983
-
Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction Methods
By Matthew Anderson, David Day, Paul Smith
"The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me
Jan 1, 2016
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023
By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Designing and managing unpaved opencast mine haul roads for optimum performance
By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks capable of hauling payloads in excess of 290 t (320 st). Mine haul roads have historically been designed emp
Jan 1, 2000
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)
By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Designing and modeling mesh communications in underground coal mines
By Michael E. Karmis
New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer
Jun 1, 2010
-
Designing And Modeling Wireless Mesh Communications In Underground Coal Mines
By K. R. Griffin
New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen
Jan 1, 2010