Design Optimization Of Grasberg Block Cave Haulage

Society for Mining, Metallurgy & Exploration
D. Marsh
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
3
File Size:
372 KB
Publication Date:
Jan 1, 2010

Abstract

The feasibility study for the Grasberg Block Cave mine, finalized in May 2008, indicated a production capacity of 160,000 tonnes per day. A rail haulage system was an integral part of the mine design. This paper describes the simulation process used in optimizing the design and discusses the key factors and variables that impact the capacity of the system. The final recommendations for the haulage level layout and associated equipment are also included.
Citation

APA: D. Marsh  (2010)  Design Optimization Of Grasberg Block Cave Haulage

MLA: D. Marsh Design Optimization Of Grasberg Block Cave Haulage. Society for Mining, Metallurgy & Exploration, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account