Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization
By Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
-
“Value Engineering” — Four Case Histories
By Maral Papazian Bedian
"Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans
Jan 1, 2003
-
Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations
By George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment
By Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
The Effects Of System Components On The Deflection Of MSE Retaining Walls
By Scott C. Vollmer
This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str
Jan 1, 2003
-
Earth Retention Systems In The Urban Environment - Special Considerations
By George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Fundamental Issues Of Displacement Auger Piling: The European Perspective
By Maurice Bottiau
When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond
Jan 1, 2003
-
Installation Of Augered Cast-In-Place Piles - Equipment
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Earth Pressure Acting On Single Driven Piles In Sand
By Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
Recent Advances In Soil Nailed Earth Retention
By Tom A. Armour
Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&
Jan 1, 2003
-
Deep Foundations In The Challenging Geology Of Central Florida
By Gary Kuhns
Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo
Jan 1, 2003
-
Instrumented Load Tests On Closed-And Open-Ended Piles
By Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
Augered Cast-in-Place Pile Manual, Second Edition, 2003
The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.
Jan 1, 2003
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details
By Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Helical Pile Foundation Anchors As A Practical Alternative
By Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction
By Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Installation Of Augerpiles In Low Headroom And Restricted Access Conditions
By Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)
By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Jacked Tunnel Construction
"Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in