Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Drag-Line Dredging

    By J. F. Magee

    THERE is nothing new about drag-line dredging for placer gold. The use of the separate unit for excavating preceded the large barge with bucket-line excavator mounted upon it, which has developed to a

    Jan 1, 1937

  • CIM
    Dragline Application In Mountainous Terrain at Fording Coal

    By R. S. Jones

    "Fording Coal Ltd. is now in its fifth year of a 15-year contract to supply 3 million long tons of clean coal per annum to its Japanese steel-making customers. The mine employs both conventional truck

    Jan 1, 1976

  • CIM
    Dragline Gearbox Filtration: The Proven Solution

    By Paul Clayton

    Case Study ? Site: BMA Saragi Coal Mine Queensland Australia ? Model: Marion 8050 ? YOM: Mid 1970s ? Boom: 97M ? Bucket: Original capacity of 100 Tonnes upgraded to 125 tonnes at time of filtrati

    May 1, 2008

  • CIM
    Dragline Gold Dredging

    By Glenville A. Collins

    IN 1932, Horace Onyett at Oroville, California, built a practical floating washing plant along the general lines as now known, using a 24 in. by 12 ft. trammel; it was fed with a ½ yard dragline bucke

    Jan 1, 1945

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    Drawpoint control using radiofrequency identification systems

    By E. Henderson, L. K. Daneshmend

    Drawpoint control is critical in determining the cutoff point for load-haul-dump mucking operations to minimize dilution. It is also necessary to ensure even mucking distribution and to prevent possib

    Jan 1, 1996

  • CIM
    Dri-Based Continuous Steelmaking: From Theory to Practice

    By M. Barati

    A collaborative research between University of Toronto and Hatch was conducted to understand and optimize the process conditions pertaining to a novel steelmaking technology. In this technology, known

    Jan 1, 2011

  • CIM
    Drift prospecting for gold in saskatchewan - use of heavy mineral concentrates in tills

    By S. Averill, B. Schreiner, V. Sopuck

    The La Ronge. Kisseynew, Glennie Lake and Flin Flon domains. the main focu for gold exploration in the southeast part of the Saskatchewan Shield, were subject to continental glacial ice advances from

    Jan 1, 1986

  • CIM
    Drift stability in moderately jointed rock

    By J. P. Harrison, M. Grenon

    "This paper summarizes the results of numerical studies on drift stability in moderately jointed rock masses. It investigates the relative pertinence of geomechanical factors such as joint orientation

    Jan 1, 2001

  • CIM
    Drift support in burst-prone ground

    By Dougal R. McCreath, Dwayne D. Tannant, Peter K. Kaiser

    The Geomechanics Research Centre at Laurentian University in Sudbury, Canada, has undertaken a five-year research program into the design of support appropriate for control-ling damage caused by rockb

    Jan 1, 1996

  • CIM
    Drill Maintenance Process Improvements: Brunswick Mine

    By Steven Doyle

    Presentation Outline ?Introduction to Brunswick Mine ?Mining Needs and Drilling Trends ?Maintenance Program ?Back to Basics ?Results ?Additional benefits Introduction Xstrata Zinc Brunswick

    Nov 1, 2011

  • CIM
    Drill monitoring for geological mine planning in the Viscaria copper mine, Sweden

    By Håkan Schunnesson, Kirsten Holme

    "When mining high grade, narrow ore bodies, the mining method often implies a very detailed knowledge of the ore contacts to avoid unacceptable ore loss and waste rock dilution. During the past decade

    Jan 1, 1997

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-Mill: Efficient Drilling and Blasting Resulting in Increased Mill Throughput at Barrick Goldstrike

    By Mark Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at th

    May 1, 2003

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • CIM
    Drilling and Blasting at the Cassiar Mine

    By T L. Horsley

    This paper deals with the drilling and blasting methods employed at the Cassiar mine, which is located just south of the B.C.-Yukon border. It covers both the "pit" and "peak" mining operations. Speci

    Jan 1, 1965

  • CIM
    Drilling and Blasting at the Phoenix Mine

    By J S. Kermeen

    This paper deals with drilling and blasting techniques at the Phoenix mine, near Grand F1nks, B.C., which is now operated by The Granby Mining Company Ltd. The difficulties of open-pit mining through

    Jan 1, 1965