Search Documents

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • ABM
    Caracterização Estrutural De Aços Interstitial Free Nitretados A Plasma

    By Ana Paula de Andrade Manfridini

    A formação de nitretos na superfície de aços Interstitial Free (IF) nitretados a plasma em função da temperatura de tratamento foi investigada. Amostras de aço IF estabilizados ao Ti, laminado a frio

    Aug 16, 2017

  • ABM
    Efeito Da Adição De Nb Na Microestrutura De Ferro Fundido Branco Alto Cromo Hipereutético

    By Dimas de Andrade Pacheco

    O estudo do efeito da adição de nióbio em um ferro fundido branco alto cromo tratado termicamente com 25%Cr e 3%C foi estudado neste trabalho por microscopia ótica, microscopia eletrônica de varredura

    Oct 30, 2017

  • NIOSH
    Solubilities of Chloride Salts of Alkali and Alkaline-Earth Metals When Sparged With Hydrogen Chloride

    By E. G. Noble

    The effects of hydrogen chloride (HCI) concentration and temperature on the solubility and hydration state of the alkali chlorides LiCI, NaCI, and KCI and the alkaline-earth chlorides, MgCI2, and CaCl

    Jan 1, 1985

  • SME
    Robbins Double Shield Breaks Through On Sochi Project

    In early March 2011, a 6.2 m (20.3 ft) diameter Rob-bins Double Shield tunnel boring machine (TBM) crossed the finish line in Sochi, Russia. The machine completed a 4.5-km- (2.8-mile-) long section o

    Jan 1, 2011

  • NIOSH
    OFR-80-78 The Development Of A Methane Monitor For Use In Electric Face Equipment In Underground Mines

    By Edward A. McClatchie

    A methane monitor that complies with 30CFR75.313 has been designed and fabricated using a novel pressure modulated infrared absorption technique. The methane monitor met or exceeded in performance

    Jan 1, 1976

  • NIOSH
    OFR-24-73 Dust Suppression In Coal Mines

    Contract No. H0110929 was awarded by the U.S. Bureau of Mines in February, 1971, to DeTer Company, Incorporated, of Mountain Lakes, N. J. The contract provided for the modification of the contractor&a

    Jan 1, 1972

  • IMPC
    Biohydrometallurgical Processing of Refractory Gold-Arsenic Concentrate with Large Content of Pyrrhotite by Using Combined Autotrophic Bacterium

    By Tamara F. Kondrateva, Evgenia E. Savari, Galina V. Sedelnikova, Rauf Y. Aslanukov, RAS (INMI), Grigori I. Karavaiko

    "The investigation is dedicated to study of biohydrometallurgical processing of refractory gold-arsenic concentrate with the large content of pyrrhotite. Sulfide concentrate of chemical constituents:

    Jan 1, 2003

  • NIOSH
    OFR-68-73 EM Location System Prototype And Communication Station Modification (3f90e3fe-7df3-4a30-87c7-cb58a9840560)

    A prototype EM Location System was fabricated and tested at the Geneva Mine near Dragerton, Utah. This system consisted of six manpack transmitters and six manpack receivers covering the frequency ban

    Jan 1, 1973

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • CIM
    Continuous Improvements of Porcupine Joint Venture (PJV) Dome Mine's Gravity Circuit

    By T. Y. Chong, J. A. Folinsbee, M. Fullam

    PJV Dome Mine has used some form of gravity concentration since start of milling operation in 1909 to recover free milling gold. Amalgamation and conventional jigs were first used and were replaced wi

    Jan 1, 2005

  • SME
    Black Thunder Mine Planning And The Environment ? Introduction

    By Hugh W. Evans

    Many reports and papers have been delivered on projects under construction or already in operation, but we believe there are few that have been written about projects yet to be built specifically deal

    Jan 1, 1975

  • AIME
    Biographical Notices of 1905

    By Bruno KERL

    THE list of deaths reported during the year 1905 comprises the following names (the figures in parentheses indicating the year in which the persons named were elected to membership:- Honorary Member.

    May 1, 1906

  • NIOSH
    OFR-74-79 Fabrication And Evaluation Of Optimized Operator Compartments

    By D. Christofferson

    This final report documents the cooperative efforts of the Engineered Systems Division and the Mining Equipment Division of FMC Corporation during performance of Bureau of Mines Contract H0252091. Imp

    Jan 1, 1978

  • CIM
    Monitoring Wastewater Quality at Falconbridge's Sudbury Operations

    By M. U. Oko

    "Monitoring of all the waste streams from Falconbridge's Sudbury Operations to determine whether they meet the required standards, has been performed for many years. By 1969, however, the number of sa

    Jan 1, 1971

  • NIOSH
    Introduction - The Mission (c66faee9-c577-4c7d-8a77-1b62b2f800d7)

    When the Organic Act of 1910 established the Bureau of Mines within the Department of the Interior, the Bureau's programs involved only health and safety research and education, and fuels testing

    Jan 1, 1976

  • DFI
    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • SME
    Groundwater Control For Two-Pass Soft Ground Tunneling

    By Cary Hirner, David Stacey, William A. Rochford

    Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T

    Jan 1, 2007