Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    The Ground Response Curve, Pillar Loading and Pillar Failure in Coal Mines

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The response of the surrounding rock mass to the creation of mining excavations determines the ultimate load on a pillar support system. In conditions where the ground is relatively soft and weak, th

    Jan 1, 2010

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Engineering Classification of Ultra-close Multiple Seam Roofs in Datong Mining District of China

    By Yingda Zhai

    The range of interburden thickness between coal seams in Datong Mining District of China is large. From mining operation point of view, the closer is between the two seams, the greater is the impact f

    Jan 1, 2005

  • SME-ICGCM
    Numerical Modeling as a Tool to Predict Pillar Condition and Assist in Mining Sequencing

    By P. Palmer

    Using 3D numerical modeling as a tool to predict rock behavior during mining extraction is still an uncommon practice at many underground operations. This paper will discuss how 3D numerical models we

    Jan 1, 2005

  • SME-ICGCM
    Influence of Structural Stress Concentration and Structural Irregularity on Longwall Gateroad Roof Control

    By Daniel Su

    Following several roof falls in the E3 longwall development of a Consol Pennsylvania Coal Company underground coal mine, an underground roof geology reconnaissance program consisting of twenty-nine 20

    Jan 1, 2002

  • SME-ICGCM
    Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine

    By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker

    "Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high

    Jan 1, 2018

  • SME-ICGCM
    Protecting Underground Coal Miners From Rib Falls

    By Michael Gauna

    In 2010, the number of fatal rib falls in U.S. underground coal mines exceeded fatal roof falls for the first time ever. While recent trends have seen roof fall fatalities reduced by about 62% since t

    Jan 1, 2011

  • SME-ICGCM
    A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)

    By Frederick Carr

    1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote

    Jan 1, 1982

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Behavioral Aspects of Roof/Rib Injuries--Implications for Training Utilizing Stereoscopic Photography

    By Edward A. Barrett

    A significant number of injuries resulting from fa118 of roof and rib may be avoided by modifying the reactive behavior of miners as they encounter potentially hazardous ground conditions. In 1984-85,

    Jan 1, 1986

  • SME-ICGCM
    Effect Of High-Extraction Coal Mining On Surface And Ground Waters

    By Francis S. Kendorski

    High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ

    Jan 1, 1993

  • SME-ICGCM
    The Influence Of Geomining Parameters Over Stress Distribution In And Around Depillaring Faces

    By Rajendra Singh

    In India, pillar mining is contributing more than 90% of underground production which involves extraction of a part of coal from bords with pillars around as natural support in the development stage.

    Jan 1, 1990

  • SME-ICGCM
    Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control

    By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard

    "Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in

    Jan 1, 2017

  • SME-ICGCM
    Cable Bolts - An Effective Primary Support System

    By Stephen C. Tadolini, John P. McDonnell

    "High-strength cable bolts have been used for ground support in underground coal mines for many years. Cable bolts are routinely used as secondary ground support in numerous longwall gateroad support

    Jan 1, 2010

  • SME-ICGCM
    3D Modelling of Mine Backfill

    By Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan

    "Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed

    Jan 1, 2017

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017