FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
An Unique Formula for the Stone-Column Group EfficiencyBy Abhijit Saha
"The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction
Jan 1, 2015
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. IntroductionBy Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of ShanghaiBy Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
San Francisco International Airport Air Traffic Control Tower Pile FoundationsBy Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz
"The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to
Jan 1, 2017
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Ground Improvement by Dry Concrete ColumnsBy Tatiana Tronda
"The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati
Jan 1, 2016
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
DFI Collaborates on Risk-Based PanelsBy Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Response of Pile and Pile Groups against Excavation Induced Ground MovementBy K Ilamparuthi, R. K. Madhumathi
"This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was
Jan 1, 2015
-
Times Square Tower: Urban SqueezeBy Tony D. Canale, Anthony Mazzo
"Times Square, arguably one of the best-known destinations in the world, has undergone and continues to undergo a re-development aimed at attracting corporate tenants to the area. Mueser Rutledge Cons
Jan 1, 2005
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Excavation Construction for the Transbay Transit CenterBy Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo
"To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of
Jan 1, 2015