Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • DFI
    Lateral Load Testing Of Pile Foundations

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • DFI
    An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, Singapore

    By Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena

    One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil

    May 1, 2022

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987

  • DFI
    Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:

    By Wolfgang G. Brunner

    The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine

    Jan 1, 2000

  • DFI
    Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour

    By Aditi Sharma, Sumanta Haldar

    Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th

    Sep 1, 2022

  • DFI
    Marine Foundation Retrofi t for the Richmond - San Rafael Bridge

    By Patrick E. Durnal, Henrik Dahl

    "A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the

    Jan 1, 2007

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Underpinning A Crane Foundation

    By Donald R. McMahon

    This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man

    Jan 1, 2006

  • DFI
    Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • DFI
    Deep Mixing Method: A Global Perspective

    By Donald A. Bruce

    Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg

    Jan 1, 1998

  • DFI
    Real-Scale Tests on Soil Mix Elements

    By Nicolas Denies, Gust Van Lysebetten, Bart Lameire, Jan Maertens, André Vervoort, Noël Huybrechts, Flor De Cock

    "Abstract Originally developed for ground improvement works, the deep mixing method (DMM) has increasingly been applied in recent years for the realization of soil and water retaining structures and a

    Jan 1, 2014

  • DFI
    The Spadina Pier Cofferdam - Design, Installation & Performance

    By Jan A. Nilsen

    This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one

    Jan 1, 1987

  • DFI
    Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ Inclusion

    By Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu

    "In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,

    Jan 1, 2015

  • DFI
    An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem

    By M. Zanotto

    [ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole

    Jan 1, 1992

  • DFI
    Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? Summary

    By Larry Rayburn

    Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi

    Jan 1, 1991

  • DFI
    Prevention Of Landslides With Rows Of Pressed-in Pipe Piles On Steep Slope

    By Takefumi Takuma, Masashi Nagano, Koji Kajino

    As part of the construction of a multi-span pre-stressed concrete girder bridge for Japan’s new high speed rail line, landslide preventive piles were installed on the flank of a steep slope. The rotar