Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Zealand Offshore Gold Exploration - The Harvester Project (bcafb7fe-f4fe-443d-a859-746bfe203af9)

    By Corner NG

    A sea bed sampling programme by CRA Exploration Pty. Limited over an area of 12000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area

    Jan 1, 1990

  • AUSIMM
    Study of Wave Formation in a High Strength Bottom Injected Metallurgical Vessel

    By R H. Eric

    Surface wave formation induced by a high-strength submerged jet in a bottom blown metallurgical vessels has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm)

    Jan 1, 2000

  • AUSIMM
    The Keer Quarry Project

    The exposed high face of Kerr's Quarry has dominated the township of Ferntree Gully for half a century. The near perpendicular face of bare dacite rock is a crumbling scar in an area of signi

    Jan 1, 1976

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Simulation of Flexible Circuits

    By MáAndrusiewicz, M M. Hilden, M S. Powell, P D. Kay, B Foggiatto

    Circuits with unconventional and potentially more complex designs are predicted to become more common in the future as plant designers and operators look to process ores more efficiently. Ideas have b

    Oct 29, 2012

  • AUSIMM
    The Sepon Copper Deposits (Laos) and Their Relation to Carlin-like Gold Mineralisation

    By B Davis, M Wallace, J Stewart, C F Burrett, J B. Cannell

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Sepon district in Lao PDR contains 1.8 Mt of JORC (2012) compliant contained Cu resourc

    Mar 18, 2015

  • AUSIMM
    A Unique Vessel for Offshore Construction

    By Dawson CF

    About 17% of the world's present day oil supplies comes from wells drilled in the continental shelf of some 28 countries. The demand for oil is increasing each year and is expected to quintuple

    Jan 1, 1970

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

    By M W. A Asad, E Topal, D S. S Sandanayake

    Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod

    Nov 24, 2014

  • AUSIMM
    A Laboratory Study of Gold Recovery from a Low-grade Tailings Dump

    A sample of tailings from a local, low grade (less than 2g/t) tailings dump was investigated for gold recovery. The tailings were very fine, with 90 per cent passing 30¦m and almost 60 per cent pass

    Jan 1, 1991

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Maintenance Inventory Planning

    One of the often overlooked factors affecting the capital investment decision in new or existing plants is the value of stock holdings necessary to maintain the plant. This paper puts forward a si

    Jan 1, 1986

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Performance and Acceptance Testing of Mine Refrigeration Plants

    There is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati

    Jan 1, 2005

  • AUSIMM
    Secondary Breakage Practice at the DOZ Block Cave Mine

    By A Sinuhaji, H Kalangi, T B. Setyoko

    Ore fragmentation at the DOZ block cave mine is highly variable, both as a function of rock type and column height of draw. Initially, the mine was constructed and equipped with limited capability to

    Jan 1, 2005

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022