Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
State-of-the-art of electroslag refining and challenges in the control of ingot cleannessBy G Stovpchenko, G Jianjun, L Medovar
Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti
Jun 19, 2024
-
Challenging Perceptions? Sustainability Reporting, the Media and MiningBy P Clark, P A. Kirsch, R Tapia Rivera
Community members’ sources of information about companies’ social investments are often influenced by the messages in a variety of communication channels, such as newspapers, television and social med
Jul 16, 2014
-
Looking for Fractures - Integrating Geochemistry with Hydrogeology to Find Inter-Aquifer Leakage above Dewatered or Collapsed Coal SeamsBy P Mulvey, M Stuckey
"Inter-aquifer leakage due to fractures caused by coal seam gas extractions or longwall mining is an important issue for both the gas and coal industries. Currently, predicting stress induced macro-po
Nov 26, 2013
-
Project and execution of the excavation for a haulage shaft with raise boring techniquesBy M Orunesu Preiata
The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo
Mar 29, 2023
-
The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram ModelBy F Ouchterlony
Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version
Aug 24, 2015
-
The basics of grinding circuit optimisationBy A Giblett, B Putland
This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be
Aug 29, 2018
-
Mineral liberation studies of IMPTEC super-fine crusher – 130 crushed productBy J Addai-Mensah, W Skinner, C Kelsey, J R. Kelly, E Baawuah
Comminution continues to be the most capital-intensive unit operation in mineral processing. The fundamental purpose of comminution is to liberate the valuable minerals so that they can be economicall
Aug 29, 2018
-
Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing IndustryThe An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i
Jan 1, 2009
-
Orebodies of the Coeur d'Alene District, Idaho: Stratigraphic Controls and Alteration HalosBy A D. Strand
The Coeur dÆAlene mining district in northern Idaho, USA is the second largest producer of silver in the world. The Proterozoic Revett Formation hosts most of the mesothermal Ag-Pb-Zn vein ore in the
Jan 1, 2002
-
Contemporary Criteria of Open Pit Long-Term Production SchedulingProduction scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
Gemstones in Australia - The State of PlayBy S R. Pecover
AustraliaÆs opal and sapphire mining industry has fallen from its peak in the 1980s and 1990s into a significant low today. This is not due to exhaustion of the resource, but instead an over-reliance
Jan 1, 2008
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central QueenslandBy K White, R Hardie, J Merritt, B Kirsch, R Lucas
Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res
Nov 26, 2013
-
Engineering and Science in Flotation Cell DesignBy J Euston
In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi
Aug 8, 2011
-
Development of mine intelligent ventilation technology in western ChinaBy S G. Li
Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with
Oct 12, 2022
-
Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical MethodsBy A Garvie, D Kentwell, J Chapman
"Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi
Jul 10, 2012
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill OperationsBy Koeng R, Richardson M, Hoare R
A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro
Jan 1, 1988
-
Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New GuineaBy P Collier
From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo
Aug 22, 2011
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021