Search Documents

  • SAIMM
    Expert Mill Control At AngloGold Ashanti

    By W. I. van Drunick

    AngloGold Ashanti Metallurgy has recently been involved in the successful installation of intelligent, expert control systems on the milling circuits. The benefits of expert systems in these highly in

    Jan 1, 2005

  • SME
    Barrick?s Zaldivar Mine Gets A Dome Cover Over Its Stockpile

    The Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (

    Jan 1, 2009

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • AUSIMM
    Economic Geology of the Wolgan Coking Coal Deposit, Western Coalfield, N.S.W., Australia

    By Graylin R. K, dea T. R, O&apos

    The Wolgan Seam of the Upper Permian IlIawarra Coal Measures of the Western Coalfield of New South Wales consists of high volatile, low sulphur, medium hard coking coal with high fluidity. This seam,

    Jan 1, 1980

  • IIMP
    Sistema Monitor de Desempeño en Tiempo Real

    By Manuel Gonzales, Luis Uzuriaga, José Choquehuaita

    "Durante el desarrollo de la operación minera, se manejan varios indicadores para el cumplimiento de los objetivos, el despachador y el supervisor de campo necesitan manejar esta información en tiempo

    Sep 1, 2017

  • SAIMM
    An Approach To The Modelling Of Spontaneous Combustion In The Goaf

    By C. Sensogut

    The phenomenon of spontaneous combustion is one of the major hazards encountered in underground coal mines both from the safety aspects and on economic grounds. Every occurrence, however small, if not

    Jan 1, 2002

  • AUSIMM
    The Geology of the Golden Cross Mine, Waihi, New Zealand

    By P C. Couper, P C. Keall, S J. Mathews, A Francis

    An epithermal gold-silver deposit is presently being developed at the Golden Cross Mine in the Waitekauri Valley, 8 km northwest of Waihi, New Zealand. Highest grade mineralisation underground is main

    Jan 1, 1991

  • SME
    Bay Tunnel-Design Challenges

    By R. John Caulfield

    The primary water supply system for the City of San Francisco and adjacent peninsula areas consists of aging and deteriorated pipelines crossing under the San Francisco Bay (the Bay). This system is h

  • AUSIMM
    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator

    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator A plate assisted electrostatic high tension roll separator has been used for

    Sep 13, 2010

  • CIM
    Gas dispersion measurements in flotation machines

    By J. A. Finch

    "Gas dispersion in flotation defines the efficiency of the process once the chemistry has been established. There are three measurements, superficial gas velocity, gas holdup, and bubble size, which a

    Jan 1, 2002

  • ISEE
    Reliability of Timing Sequence Network for Multiple Blast Holes

    By Lifeng Li, Jhon Silva-Castro

    In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m

    Jan 1, 2016

  • AUSIMM
    Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold Mineralisation

    By M Begbie, R J. Norris, D J. MacKenzie

    The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat

    Jan 1, 2005

  • ISEE
    A Student’s Path to the Explosives Industry

    By Brandon Axelrod

    This paper follows a student’s interest in explosives which began at an early age after watching a television program highlighting explosives engineering. The use of explosives in those programs led t

    Jan 1, 2015

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • SAIMM
    Interactions Of Two-Liquid CaO-MgO-FetO-P2O5 Slag With MgO Refractories

    By T. Tamura

    It is known that the CaO-FetO-P2O5slag system has a wide liquid miscibility gap at steelmaking temperatures and this two-liquid slag phase has many advantages such as high activities of both FetO and

    Jan 1, 2004

  • CIM
    Improved Cleaner Circuit Performance at the Degrussa Copper Mine with an In Situ Column Sparging System

    By E. Wasmund

    "Sandfire’s DeGrussa Copper-Gold operation in West Australia is a new high grade copper sulfide mine, which includes a 1.5 Mtpa concentrator which was completed in 2013.Early after commissioning, it w

    Jan 1, 2016

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • SME
    Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio

    By Thomas Sisley, Jozef Zurawski, Richard Switalski

    Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sew

    Jan 1, 1997

  • TMS
    Thermodynamic Evaluation Of Electronic Waste Treatment

    By Scott A. Shuey

    Keywords: E-Waste, Pyrometallurgy Many might think addressing the issue of e-waste is a new area of study. Electronics disposal has been discussed in some circles for at least the past 25 years. Th

    Jan 1, 2005