Search Documents

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Effect of Activated Carbon on the Leaching of Cobalt-Rich Ferromanganese Crust in Sulfuric Acid

    Effect of Activated Carbon on the Leaching of Cobalt-Rich Ferromanganese Crust in Sulfuric Acid

    Sep 13, 2010

  • SME
    Chunnel Repairs Call On Conjet Hydrodemolition Robots

    Train services through the Channel Tunnel linking Britain and France where scheduled to be fully restored in February 2009 following several months of repairs after a major fire in the tunnel on Sept.

    Jan 1, 2009

  • SME
    Sulfate Reduction - Designing Systems For Long Term Treatment (238ad8d9-2dab-4d3c-a3f1-88274f1b5135)

    By J. Wagner, P. Eger

    Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased

    Jan 1, 2001

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • SME
    Excavating New York?s East Side Access Project

    By Desiree Willis

    One of New York City?s largest subway projects is under way 43 m (140 ft) beneath the surface of downtown Manhattan. The East Side Access project, more than 30 years in the making, was halted after a

    Jan 1, 2008

  • NIOSH
    1977 Mineral Production Summarized

    For the sixth year in a row, the value of nonfuel mineral raw materials produced in the United States set a new record, reaching almost $17 billion in 1977. Data provided by the Bureau of Mines show t

    Jan 1, 1978

  • SME
    Performance Monitoring Of A Block Cave Mine Using Signal Processing And Waveform Analysis Of GPS Data

    By D. Rutledge

    Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active min

    Jan 1, 2008

  • AUSIMM
    Technology Selection for Removal of Contaminants from an Industrial Wastewater

    By T van der Meer, A Salokannel, M Martikainen, L M. Nevatalo, J McCulloch

    Water use and wastewater management is becoming a focus for many industries around Australia and the rest of the world. Good quality water is increasingly being recognised as a precious resource, and

    Jul 15, 2013

  • ISEE
    Standards, Environmental Regulations and Consequences for Tunnel Blasting Projects in Urban Areas in Sweden

    By Rundqvist

    The best method to minimise disturbances from traffic to the neighbourhood and in Urban is probably to go underground. For obvious reasons this will cause vibrations, noise and other environmental eff

    Jan 1, 2001

  • SME
    Mines of Today Educating Minds of Tomorrow

    By Dan Witkowsky

    Beginning on June 11, 2007, as many as 36, kindergarten-to-grade-12 (K-12) teachers will participate in a program designed to educate them all about the mining industry. The 39th Annual A Total Concep

    Jan 1, 2007

  • SME
    Chambers Creek Interceptor Sewer Tunnel

    By J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass

    The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll

    Jan 1, 1985

  • AUSIMM
    A Synopsis of the Geology of the Lyell District, Tasmania

    IT is not intended that this paper should be regarded as an account of the geology of the Lyell district. It is merely a synopsis of some of the conclusions recently arrived at in regard to the strati

    Jan 1, 1927

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • CIM
    Lithium: Usage, Demand and the Québec Lithium Mine

    By Charles Taschereau

    The statements made in this presentation contain certain forward-looking statements concerning potential developments affecting the business, prospects, financial condition and other aspects of Canada

    May 1, 2011

  • IIMP
    Integración de contratos de infraestructura de servicios transversales: un nuevo modelo de negocio en la minería chilena

    By Marcos Singer

    Anteriormente, los proyectos de infraestructura de la minería chilena se realizaban de manera desintegrada, dado que el diseño y construcción era ejecutado por empresas internacionales de ingenería y

    Sep 1, 2013

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • AIME
    Part II – February 1968 - Papers - Dislocation Structures in Niobium (Columbium) Single Crystals Observed by Optical Microscopy

    By R. G. Vardiman, M. R. Achter

    Observations of dislocation structure in niobium are presented using two techniques. Triangular pits developed by electroetching are confined to orientations in the stereographic triangle between the

    Jan 1, 1969