Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

Society for Mining, Metallurgy & Exploration
J. Davies
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
683 KB
Publication Date:

Abstract

This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long tunnel was mined through variable soft ground with only 6 m (20 ft) of cover, using an earth pressure balance tunnel boring machine. These extensive data collected from the projects unique automated and internet accessible geotechnical and TBM monitoring system, will be examined and used to explore the relationships between geological conditions, TBM operating parameters and measured settlements. The paper will also discuss the use of screw revolutions as an indicator of muck volume.
Citation

APA: J. Davies  Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

MLA: J. Davies Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account