Search Documents

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • IIMP
    Lixiviación de minerales refractarios de oro con tiosulfato de amonio: poderosa tecnología de reemplazo del cianuro en operaciones mineras a gran escala

    By Julio Cesar Tremolada

    La lixiviación con tiosulfato de amonio (ATS) puede ser considerada como una alternativa ecológica viable para lixiviar metales preciosos, por comparación con la alta toxicidad del proceso convenciona

    May 30, 2018

  • CIM
    Development of Geometallurgical Comminution Mapping and Modelling

    By Luke Keeney, Stephen Walters

    "The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t

    Jan 1, 2009

  • NIOSH
    IC 7413 Approval of Newly Developed Self-Contained Breathing Apparatus, Instructions in its Care and Use, and Training Procedure

    By G. W. Grove, E. E. Quenon

    "INTRODUCTION During September, October, and November 1946 the Safety Division of the Bureau of Mines, off' the United States Department of the Interior, Pittsburgh, Pa., tested four new types of self

    Jul 1, 1947

  • TMS
    Preliminary Evaluation of Spark Plasma Extrusion

    By K. Morsi

    The interest in spark plasma sintering has been growing considerable over the past few years. This has been brought about by the unique advantages of the process, which include reduced sintering tempe

    Jan 1, 2009

  • AUSIMM
    Kalgoorlie Tailings Retreatment Project- A Case Study

    The Kalgoorlie Tailings Retreatment Project (or "Kaltails") involves the reclamation and retreatment of approximately 50 million tonnes of gold tailing situated on the Golden Mile at Kalgoorlie, Wes

    Jan 1, 1990

  • SME
    "SAFETY FIRST" in the development of underground mining machines

    By E. Lammer

    "Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio

    Jan 1, 2011

  • SME
    Release Of Heavy Metals From Sulfide Flotation Tailings Under Deepwater Discharge Environments

    By H. K. Lin

    Deepwater discharges of sulfide flotation tailings have been practiced for several decades. Oxygen penetration and organic matter content in such environments are the two major factors that determine

    Jan 1, 2009

  • NIOSH
    Rock Mass Characterization For Excavations In Mining And Civil Engineering

    By Nick Barton

    When the Q-system was launched in 1974, the name referred to rock mass classification, with focus on tunnel and cavern support selection. Besides empirical design of support, the Q-value, or its norma

    Jan 5, 2007

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • IIMP
    Aplicación de Reforzadores para incrementar la recuperación de mineral en la explotación de banqueos descendentes con el método Sub Level Stoping en Mina Cerro Lindo.

    By Marlon Mendieta, Cristhian Guillén, Ned Vásquez

    Actualmente en mina Cerro lindo, el 60% de la producción de mineral proviene de la explotación de banqueos descendentes con el método Sublevel Stoping y ante la problemática del incremento de incidenc

    Sep 29, 2023

  • CIM
    An Overview of Optimizing Strategies for Flotation Banks

    By M. Maldonado, J. A. Finch

    "A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,

    Jan 1, 2012

  • AUSIMM
    Determination of the handleability index of adhesive bulk materials

    By M Carr, K Williams, W Chen, J Plinke

    The depletion of iron ore deposits at the face of the mine site dictates the necessity for the exploitation of formerly less attractive orebodies to meet the demand of the modern world. These orebodie

    Jul 24, 2017

  • AUSIMM
    Hot Dip Tinning Operations at Port Kembla

    A commonplace, sometimes overlooked or taken for granted, article of everyday existence is the tin can. Produced from thin gauge low carbon steel, and commonly coated with a mere 60 millionths of an i

    Jan 1, 1958

  • IIMP
    La aplicación de métodos modernos de exploración minera en el Perú

    By Alberto J. Terrones

    "En la actualidad mundial, la exploración de zonas mineralizadas se hace cada vez más restringido, dada la demanda de metales y el progresivo agotamiento de las reservas. Por ello, se realizan estudio

    Jul 20, 1955

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • AUSIMM
    Mesothermal Gold Mineralisation in the Tectonically Active Southern Alps: Analogues for the Otago Schist?

    By P O. Koons, R J. Norris, S C. Cox

     The Southern Alps is an active oblique collisional zone which has a characteristic wedge-shaped geometry above a low-angle ductile shear zone. The Main Divide region is a relatively low strain z

    Jan 1, 1997

  • CIM
    Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the World

    By Gunnar Nord

    Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti

    May 1, 2009