A Non-Linear Programming Model for Open Pit Mine Equipment Selection

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 14
- File Size:
- 1135 KB
- Publication Date:
- Dec 6, 2010
Abstract
In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipment selection in order to select the suitable loading and haulage system with the lowest total cost. The optimal size and number of equipment calculation are very important task for mining engineering because loading and haulage equipment are major proportion of open pit mining cost. Capital and operating cost are considered in objective function with respect to interest rate, insurance and tax in non-linear form. Shovel and truck annual productivity constraint, fleet matching constraint and number of truck per shovel constraint are incorporated in this optimisation problem with continuous variables. This formulation will yield total cost minimisation per hour and good accuracy compared to previous methods.
Citation
APA: (2010) A Non-Linear Programming Model for Open Pit Mine Equipment Selection
MLA: A Non-Linear Programming Model for Open Pit Mine Equipment Selection. The Australasian Institute of Mining and Metallurgy, 2010.