Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Mechanisms Involved In Reactive Flotation Of Dolomite

    By A. El-Midany

    Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom

    Jan 1, 2009

  • SME
    Study On The Recycling Of Valuable Metals In Spent Al2O3-Based Catalyst

    Based on X-ray phase analysis and exploratory experiments, a new technology was developed to recycle multiple valuable elements in spent Al2O3-based catalyst. The experimental results showed that afte

    Jan 1, 2007

  • SME
    TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case

    By Enrique Fernández

    INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l

  • SME
    Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine Shaft

    By R. Thornton

    Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he

    Feb 27, 2013

  • SME
    Challenges In Coal Mine Slope Construction

    By J. Haynes

    Coal mines in the eastern US often use sloped shafts as production beltways for ore removal, as means of access for supplies, and for ventilation. These structures are usually completed with the help

    Feb 27, 2013

  • SME
    2. Drill-Hole Data Management and Display ? Introduction

    By Richard A. Bideaux

    With both unit costs per meter and average depth of drilling constantly increasing, there is a strong incentive to maximize the information acquired from drill holes, and then to make this information

    Jan 1, 1979

  • SME
    Application Of Highwall Mining System For Recovering Coal Of End-Walls In China

    According to the previous research, it is found that the thickness of cover is mostly less than 100 m for highwall mining system. However, for most of the Chinese surface coal mines, the mining depth

    Jan 1, 2012

  • SME
    A Discussion On TBM Cutter Change Time And Cutter Life

    By E. Farrokh

    Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock

    Feb 27, 2013

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • SME
    Surface Tension Of Flotation Solution And Its Influence On The Selectivity Of The Separation Between Apatite And Gangue Minerals

    By M. Martins

    This work presents and discusses the influence of the surface tension (gLV) of methanol/water mixtures on the flotation response of apatite versus gangue minerals conditioned with flotation reagents (

    Jan 1, 2009

  • SME
    What Will Halt The Worldwide Decline In Mine Equipment Performance?

    By R. Adsero

    The analysis of equipment trends in AUSIMM?s Revision of Monograph 19; Australasian Mining and Metallurgy Operating Practices (AMMOP) in the paper by Dight et al (in press) raised some interesting and

    Feb 27, 2013

  • SME
    A Patent Licensing Regime for the Development and Protection of the Area’s Resources

    By Yao Zhou

    Under the United Nations Convention on the Law of the Sea (UNCLOS), the international seabed area (Area) and its resources are the common heritage of humanity (CHH). Patent rights can be incompatible

    Sep 1, 2014

  • SME
    Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining Activities

    By K. E. Kolm, W. H. Langer

    Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,

    Jan 1, 2001

  • SME
    Minesite Avalanche – Some Lessons Learned

    By Tim Hurley

    On Friday, May 27, 1983 at about 6 p.m., an avalanche occurred at the Revenue-Virginius Mine. Six mine personnel and two contract diamond drillers were trapped when the avalanche covered and blocked

    Jan 1, 2006

  • SME
    Engineering Research At The United States Deep Underground Science And Engineering Laboratory, In The Footprint Of The Homestake Mine.

    By A. Bobet

    Design of a new underground laboratory is underway through the auspices of the United States National Science Foundation. The Deep Underground Science and Engineering Laboratory (DUSEL) is scoped to p

    Jan 1, 2011

  • SME
    Treatment Of Plant Effluent By Electroflotatiom Process: A Review ? Introduction

    By Hassan El-Shall

    Treatment of plant effluent including waste water and associated soluble and insoluble substances, is of a primary concern of many process industries including mineral processing operations. The major

    Jan 1, 1984

  • SME
    Overcoming local conflicts and production needs related to mining. Social impact assessment and local participation

    By G. Balletto, C. Furcas

    "The mineral raw materials industry is a key-component of the Gross Domestic Product of industrialised economies, closely related to both the building and the industrial sectors. Despite this, at loca

    Jan 1, 2011

  • SME
    The Development Of An Energy Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska

    By J. Hollow, D. Walsh

    The Fort Knox Mine is located in Alaska’s interior, where the average ambient air temperatures range from -24oC in January to 16oC in July. The mill processes a free milling gold ore utilizing both a

    Jan 1, 2007

  • SME
    Port of Miami Tunnel Update?A View From Design Builder?s Engineer

    By Wern-ping Chen

    Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013