Port of Miami Tunnel Update?A View From Design Builder?s Engineer

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 857 KB
- Publication Date:
Abstract
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will connect two man-made islands, the Dodge and the Watson Islands, under the Biscayne Bay within highly porous limestone formation. Permeability as high as 0.1 cm/sec has been identified. Its 41-ft outside diameter, if constructed, is the largest precast segment lining in the US. Besides its geological and hydro geological challenges and risks, local community influence and impacts have controlled the fate of this project. This paper describes its tender design enhancements and the evolving of its slow advancement in resolving local community issues.
Citation
APA:
Port of Miami Tunnel Update?A View From Design Builder?s EngineerMLA: Port of Miami Tunnel Update?A View From Design Builder?s Engineer. Society for Mining, Metallurgy & Exploration,