    Dynamic Blast Pattern Adjustments in Multiple Row Bench Blasting

    By J R. "Dick" Daniel

    One of the more common tasks in blast management is the adjustment of: shot geometry, explosive energy, and shot timing parameters to achieve changes in blast outcomes and costs. Many of these shot pa

    Jan 1, 1996

  • ISEE
    Effective Construction Blasting Damage Control

    By Earl C. Hutchison, Gene Smith

    Extensive blasting was required to construct an underground tunnel for a 90 inch sewerage relief line. The tunnel and required excavation extended under an upper middle-class residential area in Atlan

    Jan 1, 1981

  • ISEE
    Laboratory Study on Prevention Method of Detonation Failure Caused by Channel Effect

    By Fumihiko Sumiya, Kunihisa Katsuyama, Yuji Ogata, Yukio Kato, Yuji Wada, Yoshikazu Hirosaki

    Smooth blasting technique is widely applied for tunneling road or railway construction in Japan. However, smooth blasting technique often causes problem related to detonation failure in explosive colu

    Jan 1, 2003

  • ISEE
    Improved Stability Through Optimized Rock Blasting

    By R Holmberg, C Sjoberg, B Larsson

    This paper describes the excavation of an underground naphta storage facility at Stenungsund in Sweden. The main purpose with this paper is to give an overall view of how the excavation was carried ou

    Jan 1, 1984

  • ISEE
    Computer Aided Design of Ring Blasts

    By Calvin Konya, Theodore R. Myers, Robert Lundquist

    The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig

    Jan 1, 1990

  • ISEE
    Generating Site Specific Blast Designs with State-of-the-Art Blast Monitoring Instrumentation and PC Based Analytical Techniques (da596259-c39e-4f49-b378-cc1a75a7ae1e)

    The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and

    Jan 1, 1991

  • ISEE
    Pre-Blast Surveys and the Importance of Photographic Technique

    By James Ballard, Charles H. Dowding

    Recent Office of Surface Mining regulations have called for pre-blast surveys of residences within one-half mile of blasting. Unless lighting effects and the multiple origins of cracks are recognized,

    Jan 1, 1979

  • ISEE
    The Effects of Rock Mass Characteristics on Fragmentation in Controlled Blasting Experiments in Small Development Headings

    By Chantale Doucet, Yves Lizotte, Alan Cameron

    A joint Federal Government-Industry research project on the effect of geology on the fragmentation of rock excavated by blasting in underground developments was conducted at the CANMET Experimental Mi

    Jan 1, 1996

  • ISEE
    A Case Study of Blast Damage Evaluation in Open Stope Mining at Kidd Creek Mines

    By Hung Tran, Qian Liu, Patrick Andrieux, Dave Counter

    Blast damage in open stope mining has been an important concern in controlling ore dilution. Severe damage to the surrounding rock mass can result in the caving of waste rock and/or backfill materials

    Jan 1, 1998

  • ISEE
    New Development in Mechanized Uphole Charging of Explosives

    By Bengt Ljung

    Manual charging of long upward drilled holes in mines is a heavy and risky job today. Mechanization of this work has been requested for some time by miners, their supervisors, industrial safety organi

    Jan 1, 1978

  • ISEE
    High Resolution Seismic Refraction Tomography for Determining Depth of Blast Induced Damage in a Mine Wall

    By Stephan Iversan, Janae Singer

    High resolution seismic refraction tomography has proved to be a useful tool to effectively estimate depth of blast induced damage in rock. Excavation blast damage can be as shallow as 1 to 2m (3 to 7

    Jan 1, 2009

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Considerations for the Excavation of Subsurface Facilities by Drill and Blast Methods, Yucca Mountain Project

    By Roger Keller, Jason Ryan

    A number of studies have evaluated excavation methods for the construction of subsurface facilities for a potential deep geologic repository for the disposal of nuclear waste at Yucca Mountain, NV. Ma

    Jan 1, 2001

  • ISEE
    PPV. SD. Really? Still??

    By Doug Anderson

    Two quantities, Peak Particle Velocity (PPV) and Scaled Distance (SD), have controlled aspects of many blasting projects and operations for a long time. Vibration criteria typically use both PPV and S

    Jan 1, 2018

  • ISEE
    Source Scaling Study of Single-Fired Mining Explosions

    By Brian Stump, Rong-Mao Zhou

    A series of single-fired (simultaneously detonated) explosions were conducted in an Arizona copper mine. The explosions spanned yields from 1700 to 13600 lbs (773 to 6169 kg) and were all detonated in

    Jan 1, 2006

  • ISEE
    Reduction of Vibration in a Low Frequency Zone at Construtora Sultepa EV Quarry

    By D. C. Valdemeri, Oppermann J. P. Z., R. G. Schaarschmidt, C. S. Mendonca

    This case study was conducted in an aggregate company, located at Estância Velha town, RS, Brazil. The study was based on the results of vibration monitoring mainly in terms of PPV (peak particle velo

    Jan 1, 2015

  • ISEE
    Investigation of Ground Vibration Induced by Blasting at Hisarcik Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman

    This paper presents the results of ground vibration measurements carried out in Hisarcik Boron open pit mine located on the west side of the central Anatolia near Kütahya province in Turkey. Within th

    Jan 1, 2006

  • ISEE
    Overburden Blasting Vibrations: Analysis, Prediction, and Control

    By Otto E. Jr Crenwelge, Timothy A. Peterson

    We have developed a site-specific method for analysis, prediction, and control of ground vibrations induced by overburden blasting operations in surface coal mines. Field tests conducted at R&F Coal C

    Jan 1, 1986

  • ISEE
    Ammonium Nitrate: Projections on Its Future Availability

    By Duane Skidmore, Calvin Konya

    The supply crunch and cost rise for ammonium nitrate (AN) over the past year have been influenced by a number of factors. These include a general inflationary tendency, particularly great cost rises i

    Jan 1, 1975

  • ISEE
    Journal: 19th Annual Photo and Art Contest - Honorable Mention "Bear Lake Hydro Project"

    By Corry Goumans

    The job location is at Bear Lake Hydro Project located north of the town of Sechelt, British Columbia, Canada

    Jan 1, 2013