Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984
-
Mechanisms of Rib Sloughing and Methods of Controlling Thick Bolted RibsBy Shuangsuo Yang
Coal ribs can roughly be divided into three types: (1) roof and floor rocks are similar to ribs, (2) roof and floor rocks are stronger than ribs, and (3) roof and floor rocks are weaker than ribs. Dif
Jan 1, 2005
-
The Development and Planning of Multiple Level Underground Limestone MinesBy Bruce W. King, David A. Newman
"Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str
Jan 1, 2016
-
Detailed Underground Measurements Of Roof Deflection And Bed SeparationBy André Vervoort
To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and pil
Jan 1, 1992
-
Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead LineBy Axel Preusse
A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate
Jan 1, 2003
-
Surface Subsidence Due to the Combined Effects of Underground Coal Mining and Groundwater WithdrawalBy Shu Cheng
Abstract: Based on the consolidation theory of soil dewatering and land subsidence prediction methods in soil mechanics, preliminary analysis of surface subsidence and movement due to groundwater with
Jan 1, 2002
-
Experimental and Numerical Methodology Assessment of Load Transfer Capacity of BoltsBy Naj Aziz
n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me
Jan 1, 2005
-
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement ? A Case StudyBy Behdeen Oraee-Mirzamani
Tunnel stability has an important role in the production process of an underground coal mine. There are various methods for analysing tunnel stability, such as numerical methods and analytical methods
Jan 1, 2013
-
BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and ApplicationBy Dan Payne
Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid
Jan 1, 2006
-
The Strong Outbursts of Coal and Gas in Coal Mines in ChinaBy S. N. Zhow
China has at least 200 collieries suffering from the problem of instantaneous outbursts of coal and gas. The strong outbursts often occurred in active tectonic lanes and areas of high stress concentra
Jan 1, 1987
-
Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal MinesBy Murali Gadde
Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli
Jan 1, 2005
-
Research on the Characteristics of Mine Pressure and Overlying Strata Movement in Downward Mining Longwall Panels in Steeply Dipping SeamsBy Jingyi Cheng
Many longwall panels in China are laid out along the dip direction such that the direction of longwall retreat mining is along the strike direction of coal seams. Downward mining longwall panels in st
Jan 1, 2013
-
Multi?Seam Mining Over Old Workings with Small Pillars - A Case StudyBy Peter Zhang
Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough
Jan 1, 2014
-
Definition of Ultra-close Multiple-seams and its Ground Pressure BehaviorBy Baisheng Zhang
The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.
Jan 1, 2005
-
Basics on the Dimensioning and the Extraction of Shaft Safety ZonesBy Anton Sroka
The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th
Jan 1, 2005
-
Highwall Mining in a Multiple-seam, Western United States Setting Design and PerformanceBy Tom Vandergritft
With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall
Jan 1, 2005
-
The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator PlanBy S. Mehrdad Heidari
The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a
Jan 1, 2005
-
Shear Bond Characteristics in Grouted Cable BoltsBy Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden StrataBy Shugang Li
The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this
Jan 1, 2005
-
Ground Control of a Mine Stope in Weak Rocks Subjected to High In-situ Stresses - A Case StudyBy Charlie Li
A cut-and-fill mine stope, located at a depth of about 1000 m in a lead-and-zinc mine, was closed down because of large roof convergence and fractures appearing on the hanging wall. The instability pr
Jan 1, 2005