Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Economical Piling In Soft Soils And Expansive Clays

    By D. Mohan

    Soft to medium dense silty and clayey soils are found in many parts of India and conventional friction piles have normally been used for foundations of high rise buildings and other structures on such

    Jan 1, 1989

  • DFI
    Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)

    By Sikko Doornbos

    For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a

    Jan 1, 1987

  • DFI
    Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis

    By G. Price

    The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less

    Jan 1, 2010

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • DFI
    Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test

    By Liqun Liang

    Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and

    Jan 1, 2011

  • DFI
    Soil-Cement Walls For Excavation Support

    By David S. Yang

    The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab

    Jan 1, 2003

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • DFI
    Emplacement Techniques: Impervious And Pervious Wall Construction ? Summary

    By Fred C. Schmednecht

    For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w

    Jan 1, 1999

  • DFI
    Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine

    By Timothy J. Myers

    Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso

    Jan 1, 2009

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, Washington

    By Roy A. Imbsen

    Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to en­hance performance of

    Jan 1, 1998

  • DFI
    A Review Of Typical Foundations Used In The City Of Cleveland, OH

    By David V. Lewin

    Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On

    Jan 1, 1985

  • DFI
    The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise Building

    By Lu Peiyan

    A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re

    Jan 1, 1991

  • DFI
    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • DFI
    Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava

    By J. Stacho, Frankovská. J.

    "Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on

    Jan 1, 2014

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004