Installation Of Augerpiles In Low Headroom And Restricted Access ConditionsBy Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Economical Piling In Soft Soils And Expansive ClaysBy D. Mohan
Soft to medium dense silty and clayey soils are found in many parts of India and conventional friction piles have normally been used for foundations of high rise buildings and other structures on such
Jan 1, 1989
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based InclinometersBy Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Soil-Cement Walls For Excavation SupportBy David S. Yang
The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab
Jan 1, 2003
-
Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - SynopsisBy Sanjeev Malhotra
The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins
Jan 1, 2000
-
Emplacement Techniques: Impervious And Pervious Wall Construction ? SummaryBy Fred C. Schmednecht
For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w
Jan 1, 1999
-
Micropile Foundations For Support Of New Bridge Structures Over Abandoned MineBy Timothy J. Myers
Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso
Jan 1, 2009
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, WashingtonBy Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
A Review Of Typical Foundations Used In The City Of Cleveland, OHBy David V. Lewin
Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On
Jan 1, 1985
-
The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise BuildingBy Lu Peiyan
A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re
Jan 1, 1991
-
Treated Round Wood Piling SpecificationsBy James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
Instrumented Driven Steel Tube Piles At Canary Wharf, LondonBy A. R. Gaba
Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are
Jan 1, 1989
-
Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota ValleyBy Roger A. Archabal, Omar A. Conte, Gustavo Langoni
This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr
Jan 1, 2018
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in BratislavaBy J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po