Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Use Of The Impression Pile To Reduce Carbon EmissionsBy S. E. Stallibrass, A. M. McNamara, J. P. Panchal, Leonardo M. LaLicata
Urban development in congested cities requires a better exploitation of the available surface, leading to taller structures. These buildings are usually founded on piles that have to be increased in d
May 1, 2022
-
Selection And Design Of Continuous Flight Auger And Drilled Displacement PilesBy Dan Brown
This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary
Jan 1, 2005
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Today’s Connectivity: Using Historical Data to Anticipate Future RiskBy Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019
-
Oakland Turning Basin Bulkhead Spin Fin® PileBy Todd Nottingham
Channel deepening of major ports is challenging designers to explore innovative solutions to ensure stability of bulkheads, such as for the Oakland Inner Harbor. This particular challenge was met with
Jan 1, 2008
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case StudiesBy Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste
Jan 1, 2017
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Non-Destructive Testing Of Pile Foundations In India: Current Practices And ChallengesBy Heman Manchanda, Jyoti Agarwal
Several infrastructure projects are under construction in India; many of them involves construction of deep foundations like reinforced concrete and steel piles to support super structures. As most of
Sep 1, 2022
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
“Value Engineering” — Four Case HistoriesBy Maral Papazian Bedian
"Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans
Jan 1, 2003
-
Soil Mixing Monitoring System Quality Control for the SR-83 Project in FloridaBy Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni
"SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl
Jan 1, 2017
-
Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal IssuesBy James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson
New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering
Jan 1, 2019