Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mineral Decomposition and Leaching Processes for Treating Rare Earth Ore ConcentratesBy C. Edwards
"The processes for rare earth (RE) extraction include the decomposition of RE ore concentrate minerals, and the concurrent or subsequent leaching of the rare earth elements (REEs) from the decomposed
Jan 1, 2012
-
Performance Reporting Using Schedule Compression IndexBy Bahaa Hussein
Considerable number of methods and procedures has been introduced for trending and progress reporting of engineering, procurement and construction projects. This paper introduces a novel method, desig
Aug 1, 2013
-
Fraser Mine Material Handling SystemWeekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are
Feb 1, 2008
-
The Co-Fe-S SystemBy W. Curlook, L. M. Pidgeon
THE PURPOSE of this investigation was to study part of the ternary system Co-Fe-S. Jensen ( 1) established the solubility limits of sulphur in pyrrhotite. The compound with 61.7 per cent Fe, correspon
Jan 1, 1953
-
Extraction of radium from uranium tailingsBy Desmond M. Levins, Reginald K. Ryan
"Removal of radium from uranium tailings would substantially lessen their environmental impact because it would eliminate, or greatly reduce, the hazards arising from radon emanation, leaching of radi
Jan 1, 1980
-
Banking/Financing Viewpoint: Beyond the Feasibility StudyBy David Laing
Completion of a Feasibility Study represents a major milestone in the development path of a mine, and one which typically triggers a need for project financing. Obtaining funding for construction reli
May 1, 2010
-
Recovery of Tungsten and Vanadium from Spent SCR Catalyst by Hydrometallurgical MethodsBy Gyeonghye Moon, Inhyeok Choi, Jyothi Rajesh Kumar, Jin-Young Lee
"This paper deals with the recovery of the tungsten and vanadium from spent SCR catalyst leach liquors by different hydrometallurgical methods. The first part consists of pressure leaching of spent SC
Jan 1, 2017
-
Process Mineralogy of Copper and Lead Concentrates: Uncertainties and Metallurgical DecisionsBy Mostafa Benzaazoua, Emilie Ré, Raphaël Mermillod-Blondin, Hassan Bouzahzah, Jean-François Wilhelmy, University of Québec in Abitibi-Témiscamingue
"We analyzed two copper and lead flotation concentrates from the LaRonde mill using MLA technology (Mineral Liberation Analyzer) to identify the contaminants and to quantify their size and liberation.
Jan 1, 2016
-
Notes on Fire Prevention and Fire Insurance for Mine BuildingsBy W. G. Millar
Until a fire occurs, insurance and prevention work are often looked on as unavoidable necessities, but as insurance is back of all business credit, it is essential to know that in case of damage money
Jan 1, 1928
-
Bentonite-A Challenge for Canadian lndustryAlthough Canadian bentonite is competitive in quality for most uses, it has not been accepted for the pelletizing of iron ore concentrates. In 1962, Canada consumed about 10,000 tons of imported bento
Jan 1, 1964
-
Recovery of Copper from Printed Circuit Boards Using Ammoniacal Alkaline SolutionBy M. Tanaka, T. Oishi, K. Koyama, S. Alam
"A novel hydrometallurgical process for copper recovery from waste printed circuit boards has been proposed, which consists of selective leaching of copper metal as Cu(I) by Cu(II) in ammoniacal alkal
Jan 1, 2012
-
Results and Significance of Drilling Operations in the Athabaska Bituminous SandsBy G. S. Hume
Introduction Core drilling of the bituminous sands of northern Alberta has been carried on by the Mines and Geology Branch, Department of Mines and Resources, under the supervision of the Director,
Jan 1, 1947
-
Cemented Sand Fill at lncoBy J. McCreedy
"The addition of Portland cement to hydraulic sand fill has resulted in the production of stable and self-supporting cemented sand fill. The use of cemented fill in the mines of The International Nick
Jan 1, 1966
-
Study on Acoustic Wave Propagation in Fractured Rock Mass Under High in-Situ Stress of Model Test and Damage Constitutive RelationBy Hang Zhao, Xinping Li, Pingan Wu, Yi Luo
"The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under h
Jan 1, 2015
-
Geochemical Methods Applied to Uranium Exploration in Southwest Baffin IslandBy Yvon T. Maurice
Under the auspices of the Federal-Provincial Uranium Reconnaissance Program, a geochemical orientation survey was undertaken in an area of uraniferous Lower Proterozoic (Aphebian) rocks near Cape Dors
Jan 1, 1977
-
Atlantic Continental Margin -its History, its FutureBy G. H. Long, D. H. Magnusson
THE DEFINITION of the continental margin, as considered in this paper, is in the broad sense: " ... those provinces of the continents and of the oceans which are associated with the boundary between t
Jan 1, 1970
-
Influence of Cold Rolling and Recrystallisation on the Microstructure and Hardness of Commerial?Purity AluminumBy Z. Huda
The effect of various percentages of cold-working and recrystallization on the microstructure and hardness of commercially-pure aluminum plate, has been studied. The 'A critical deformation for t
Jan 1, 2007
-
866 - Problems of Large Relief or Weathered Shear Joints in Granites and Basalts in Brazilian Dam FoundationsBy G. R. Sadowski
"Large subhorizontal joints have been found in the foundation excavations in basalt and granite of Brazilian Dams. Some spread for hundreds of square meters showed slickensides—polished surfaces plus
Jan 1, 2015
-
The Solubility of Nitrogen tn Liquid Iron ... Titanium AlloysBy M. Mohan Rao
A Sievert ' technique was used. The few determinations made on 10 per cent and 20 per cent V alloys did not show any deviations from Sieverts' law up to I>N2 = 1 atmosphere. The same held tr
Jan 1, 1963
-
Simulation for Ball Mill Sizing: The Path to a Successful Plant Start-UpBy A. Rousselet, H. Gilbert-Tremblay, A. Berton
"Robex Resources interrupted production at the Nampala Mine in September 2014 following throughput and gold recovery results which were below expectations during the first months of operation. After a
Jan 1, 2018