Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of Suspect Terranes of the Gympie Province with Other Units of the New England Fold Belt, Eastern Australia

    The Gympie Province is a unique tectono-stratigraphic unit which does not fit into the overall palaeogeographic pattern of the New England Fold Belt (NEFB), and part of it has been proposed as an exot

    Jan 1, 1990

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AUSIMM
    The Preparation of Pastefill and Its Use at Some Canadian Mines

    Two key elements in the design of a pastefill or high density backfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owing

    Jan 1, 1998

  • AUSIMM
    Western Deep Levels South - A Technical Challenge

    By Lloyd F, Bayley F. J

    The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦

    Jan 1, 1988

  • AUSIMM
    Creating Peer Groups to Accept Technology

    By Ken Campbell

    Exploration and mining in Third World countries will essentially be an exercise in the transfer of technology. We must not underestimate the effort it will take to develop the necessary industry pee

    Jan 1, 1994

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western Australia

    By A Weeks, W J. Shaw, A Kuk

    Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra

    Aug 18, 2014

  • AUSIMM
    Mining and Handling of Nauru Phosphate Rock

    Nauru Phosphate, which is one of the world's highest grade deposits discovered to date, contributed in 1969, 2.2 million tons of the total world production of 77.7 million tons. Phosphate produ

    Jan 1, 1971

  • AUSIMM
    Effects of Joint Intensity on Rock Fragmentation by Impact

    By K Esmaeili, S Aziznejad

    Impact-induced rock fragmentation is a mechanism that is commonly used for rock breakage in drilling and crushing. Additionally, rock fragmentation by blasting is frequently used in rock excavation op

    Aug 24, 2015

  • AUSIMM
    Large Diameter Tunnel Excavation Through Mixed Ground of Clay and Basalt Using Tunnel Boring Techniques

    The excavation of a tunnel through rock and mixed ground of basalt and silty clays presents a challenge to engineering organisations. Such was the situation facing the Melbourne and Metropolitan B

    Jan 1, 1987

  • AUSIMM
    Perceptions of the Permian Pacific - The Medusa hypothesis

    The present Pacific Ocean arose from rapid sea-floor spreading that commenced in the late Mesozoic, and continues to the present day. It started within what is here called the Medusa complex of se

    Jan 1, 1987

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    Effects of Subsidence on Steeptopography and Cliff Lines

    By Carter J. P

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Resear

    Jan 1, 1992

  • AUSIMM
    Modern Blast-Furnace Practice

    By Irving R. C

    THE objective of the iron smelter is naturally the production of high quality iron at the lowest practicable cost. To enable this, large tonnages are put through the blast furnace, and, at the same ti

    Jan 1, 1930

  • AUSIMM
    Current Project of the Geological Survey of Queensland in Northern Queensland

    By Kay JR

    In 1984 a new Regional Geological Mapping Program (RGMP) was commenced by the Geological Survey of Queensland (GSQ); the new program was in response to the withdrawal of the Bureau of Mineral Resource

    Jan 1, 1986

  • AUSIMM
    The Development and Application of Laser Surveying Systems

    By Fuller T

    This paper introduces the technology used in laser surveying systems, and the development of a reflectorless one-man total station. These systems are being used for applications such as blast patter

    Jan 1, 1995

  • AUSIMM
    Improving Gold Flotation Recovery at Porgera by reducing Non-Sulphide Gangue Entertainment

    The Porgera mine and treatment plant are located in the Enga Province of Papua New Guinea. Gold in the Porgera deposit is found free and in association with the primary sulphide mineral pyrite. The

    Jan 1, 1997

  • AUSIMM
    Selective Open Pit Mining and Ore Treatment at Croydon Gold Mine, North Queensland

    By Kandemir H, Stafford G

    The Croydon Gold Mine is located in northwest Queensland and is a joint venture between Central Coast Exploration N.L. and Pancontinental Mining Ltd. The mining operation commenced in 1987 and co

    Jan 1, 1989

  • AUSIMM
    A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal Mine

    By A Patwardhan, M M. Alam, K K. Thatavar

    A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-

    Jan 1, 2005

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999