Utilization of the OSI Underground System's Tandem Anchor to Improve the Weak Roof's Stability of Underground OpeningsBy Tom Blevins, Roland Walker, Jinsheng Chen
"The Dywidag-Systems International DSI Tandem Anchor bolt, with an improved expansion shell-washer design, can substantially reduce potential entry roof falls caused by twisted or deformed expansion s
Jan 1, 2010
-
Ground Control Design For Multiple Seam Mining Using Finite Element AnalysisBy John Stankus
Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre
Jan 1, 1999
-
Analysis Of Practical Ground Control Issues In Highwall MiningBy R. Karl Zipf
Highwall mining is an important coal mining method. Upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production. A review of the M
Jan 1, 2004
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Development of a Risk Rating System for Use in Underground Coal MiningBy Johann van Wjk
Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,
Jan 1, 2002
-
Vertical Stress Redistribution Around A Retreating Longwall Face EndBy D. A. Payne
Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl
Jan 1, 1995
-
Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case StudyBy Lance R. Barron
The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th
Jan 1, 1990
-
Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining ConditionsBy Ruixiang Gu
The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie
Jan 1, 2014
-
Numerical Modeling of Standing Support Performance in Entries between Longwall GobsBy Benjamin Mirabile
"Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth
Jan 1, 2015
-
Mine Convergence When Using Mobile Roof Supports In Pillar RecoveryBy J. R. Stoltz
To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr
Jan 1, 1999
-
Use Of Database In Ground Control To Identify Weightings And Water InflowsBy G. C. Xiao
A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate
Jan 1, 1990
-
Overview of Safety Considerations with Highwall Mining OperationsBy George Gardner
The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili
Jan 1, 2002
-
A Statistical Overview of Retreat Mining of Coal Pillars in the United StatesBy Christopher Mark
The demographics and safety record of the pillar retreat segment of the U.S. coal industry was analyzed using statistics collected by the Mine Safety and Health Administration. Pillar recovery is prac
Jan 1, 1997
-
A Roof Model and Its Application in Solid Backfilling MiningBy Meng Xiao, Peng Huang, Lizin Lan, Feng Ju, Shuai Guo
"Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process o
Jan 1, 2016
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor ConditionsBy M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
Whole-Mine Subsidence over Tabular Deposits and Related SeismicityBy William G. Pariseau, Michael K. McCarter
"The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc
Jan 1, 2016
-
The Evolution of Pre-Driven Recovery Roadways at Crinum MineBy Adam Mackenzie, Dan Payne, Yass-Marie Rutty
"Historically, the Crinum mine has experienced significant falls of ground when longwall production slowed to prepare for recovery in weak roof areas. These conditions continue through the recovery pr
Jan 1, 2016
-
Utilization Of Polymer Grid Structures In Shield Recovery OperationsBy Brian E. Travis
Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed
Jan 1, 1993
-
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona MineBy Steve P. Signer
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p
Jan 1, 2001
-
A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery EntriesBy John C. Stankus
The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un