  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • DFI
    Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

    By L. J. Whitworth

    Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham

    Jan 1, 1989

  • DFI
    Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)

    By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin

    "Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

    Jan 1, 2017

  • DFI
    Wadi Dayqah Dam Curtain

    By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen

    "The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the

    Jan 1, 2016

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Real-Time Anchor Testing and Data Management

    By Bora Okumusoglu, Devon K. V. Mothersille

    "AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front

    Jan 1, 2017

  • DFI
    Port Orange Drilled Shaft Load Tests - Introduction

    By David K. Crapps

    The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load

    Jan 1, 1989

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Engineering Foundation Support For Las Vegas Strip's Tallest Hotel Casino

    By Nicholas P. Gura

    This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A

    Jan 1, 2007

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground Conditions

    By Emad Farouz

    This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan

  • DFI
    Field Testing Of Energy Piles At Virginia Tech

    By Olgun

    Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

  • DFI
    Ground Energy Systems In London - A Best Practice Approach

    By Ryan Law

    Ground energy systems are being installed in increasing numbers in the United Kingdom. This is particularly true in London where planning regulations require larger scale developments to provide at l

    Jan 1, 2008

  • DFI
    Using Dynamic Pile Testing To Overcome Surprising Soil Variations

    By H. (Sam) Salem

    A site investigation for a wide and tall hotel building, in the San Juan Bay area, Puerto Rico, indicated a soil profile of silty clay on sand, soft and loose enough to require piled foundations. The

    Jan 1, 2008

  • DFI
    Construction Induced Vibration during Sheet Pile and Pile Driving in Deep Excavation

    By Ambarish Ghosh, Subhaprasad Chakraborty

    "Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i

    Jan 1, 2015

  • DFI
    Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a Wetland

    By Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian

    "Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2

    Jan 1, 2017

  • DFI
    Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist

    By Bill Shea, Gordon King

    "For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood

    Jan 1, 2012

  • DFI
    A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE Embankment

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a

    Jan 1, 2017

  • DFI
    Design of the Lift-in Dam at Olmsted on the Ohio River

    By Dale E. Berner

    A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo

    May 11, 2007

  • DFI
    Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach

    By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon

    "Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled

    Jan 1, 2005

  • DFI
    Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)

    By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey

    "Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility