Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

- Organization:
- Deep Foundations Institute
- Pages:
- 8
- File Size:
- 428 KB
- Publication Date:
- Jan 1, 1989
Abstract
Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham. Methods of pile construction were conventional sandstone rock sockets, sleeved piles and voided piles. The results of these load tests are compared with the theoretical predicted behaviour based on the results of unconfined compressive tests of rock core taken on the Convention Centre site and on other sites in the central Birmingham area. On the basis of this work, the various design procedures are discussed.
Citation
APA:
(1989) Rock Socket Piles In The Sherwood Sandstone Of Central BirminghamMLA: Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham. Deep Foundations Institute, 1989.