Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Background Characterisation Study of Naturally Occurring Acid Rock Drainage in the Sangre De Christo Mountains, Taos County, New Mexico

    By B Walker, A Robertson, C Wels, S Fortin

    A background characterisation study was carried out in the Sangre de Cristo mountains, New Mexico, to: quantify naturally occurring contaminant loads from mineralised areas; define site-specific back

    Jan 1, 2003

  • AUSIMM
    Dragline Digging Methods in Australian Strip Mines - A Survey

    By Baafi EY

    Open cut mining in Australia is facing the greatest challenge in its history in attempting to compete not only with other operations internationally, but also with underground operations domestically.

    Jan 1, 1998

  • AUSIMM
    New Technology in Hydrology and Erosion Assessment for Mine Rehabilitations

    By Gyasi-Agyei Y

    In recent years rapid advances have been made in the technology used for hydrology and erosion modelling of rural catchments. These advances have been driven by the growing availability of digital t

    Jan 1, 1995

  • AUSIMM
    The OK Tedi Project

    Ok Tedi Mining Limited commenced construction in mid-1981 of facilities and infrastructure to mine and process gold ore at Mt Fubilan in Papua ew Guinea. Production ofgold began more or less on schedu

    Jan 1, 1985

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project

    Geomechanics is one of the more specialised aspects of site supervision on a major tunnell- ing project. The controlled deformation of a rock mass as a result of tunnelling and the knowledge of loa

    Jan 1, 1976

  • AUSIMM
    Phosphorus association with goethite – effects of Fe(II)-catalysed recrystallisation

    By M I. Pownceby, N Karimian, A Frierdich

    These may be found with goethite through mechanisms including direct substitution or coprecipitation of nanocrystalline phases. Understanding P incorporation in goethite has significant implications f

    Sep 18, 2023

  • AUSIMM
    MillMapper Experiences - A Mill Condition Monitoring and Operational Improvement Case Study

    This paper describes the MillMapper technology developed for condition monitoring of liners and other operational parameters in grinding mills used for mineral comminution, by presenting a case study

    Jan 1, 2008

  • AUSIMM
    The Application of Geographic Information Systems to the Analysis and Mapping of Heavy Metal Contamination Around Lavrio Mine Workings, Greece

    By Durucan S

    The southern Attiki peninsula is a very interesting area from an environmental point of view. The port and the city of Lavrio is situated at the east coast of the peninsula with about 10 000 inhabit

    Jan 1, 1995

  • AUSIMM
    Fundamental Technology Change in the Iron and Steel Industry

    The world is getting flatter through internet, mobile phone technology, relatively low cost travel, massive outsourcing of manufacturing to China and the transfer of company backroom operations to Ind

    Jan 1, 2006

  • AUSIMM
    Blasting Risk Management ù Hazards, Variations and Opportunities

    The risks faced by organisations are part of a risk continuum. They can be evaluated in terms of hazard, uncertainty and opportunity as well as by the degree of influence they have on conformance, ope

    Jan 1, 2001

  • AUSIMM
    Application of High-resolution Seismic Reflection Surveys to Exploration for Blind Vein Systems at the Cracow Low-sulfidation Epithermal Field

    By J Cook, S Pike, D Pridmore

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The application of high-resolution seismic reflection to map structure and/or mineralisatio

    Mar 18, 2015

  • AUSIMM
    Gold Mining in Australasia - Past and Present and Exploration Opportunities to the Year 2000 (457a4ad5-07cf-4992-b7b5-28edafda912c)

    Mining had a very considerable effect on the country's development. The visual evidence remaining is an integral part of New Zealand history. Early mining for manganese and copper in the 1840s wa

    Jan 1, 1990

  • AUSIMM
    A Practical Method of Approach to the Problems of Mineral Flotation

    Response of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le

    Jan 1, 1963

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    Geotechnical Engineering at Ok Tedi - A Multidisciplinary Approach

    By A P MACONOCHIE

    The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal

    Jan 1, 1992

  • AUSIMM
    Haul Truck Maintenance Procedures at Bougainville Copper Limited

    The procedure used for Truck Maintenance is described systematically in this paper. Emphasis is given to manpower required, work facilities, daily maintenance and oil sampling procedure. Scheduled

    Jan 1, 1982

  • AUSIMM
    Beyond The Scheduling Horizon û Improving The Next Decade Æs

    It is usually the case that the short-term plannerÆs role is occupied by the younger site mining engineer. ThatÆs because mine scheduling is generally seen as a mundane and thankless task. But, short-

    Jan 1, 2003

  • AUSIMM
    Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft Ground

    By H Bleuler

    A new portal and access drift was constructed by Concrete Constructions for BHPÆs Elouera Colliery, south of Wollongong.The portal area at the base of the Illawarra Escarpment is in soft colluvium mat

    Jan 1, 1999

  • AUSIMM
    Some Occurrences of Stannite in Australia

    Investigations of the Mineragraphic Section; Commonwealth Scientific and Industrial Research Organisation, have included most of the known stannite-bearing ores in Australia, and have revealed several

    Jan 1, 1951