Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    3D mine mapping – improving grade control and reconciliation in underground mines using photogrammetric imagery and implicit modelling techniques

    By R H. Knight

    Production mine geology must be accurate and efficient in order to reduce risk and ensure that ore value and mining operation revenue are maximised. Present grade control practices are commonly based

    Sep 20, 2017

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Mining Can Improve the Environment

    Mining is a necessary part of our modern lifestyle. However, mining can cause damage and pollution of the environment and therefore we must manage our resources wisely accounting for the physical,

    Jan 1, 1987

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • AUSIMM
    Experimental Galleries

    There is no other effective way for study ing firedamp and coaldust explosions than to produce controlled explosions in a pre-monitor- ed environment - either mine openings kept for the purpose, or

    Jan 1, 1981

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016

  • AUSIMM
    Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD Modelling

    By A Manzoori, M T. Shadloo

    This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part

    Jan 1, 2006

  • AUSIMM
  • AUSIMM
    Experiences from developing a road map to attractive, inclusive and safe mining workplaces

    By L Abrahamsson

    The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili

    Sep 1, 2024

  • AUSIMM
    Selection and Evaluation of Tunnel Excavation Methods for Heterogeneous Grounds

    By Tagawa H

    In Japan, geological condition do not only vary in a wide range of strata but are also extremely complex with the existence of faults and aquifers. With respect to rocks, in particular, it is very

    Jan 1, 1987

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Initiation Systems - What Does the Future Hold?

    The rapid industrialisation of the world was driven by an improved ability to utilise chemical energy. Unfortunately harnessing explosive energy did not come cheaply given the hundreds of lost live

    Jan 1, 1990

  • AUSIMM
    Evaluation of a New Vision System Algorithm for Automated Fragmentation Measurement from a Shovel

    By M J. Noy

    The automated measurement of rock fragmentation particle size distribution in the muck during muck excavation has been developing over the last 16 years. The introduction of stereo camera imaging of t

    Aug 24, 2015

  • AUSIMM
    Middle Management for the Mineral Industry - The Challenge of the 1980s

    By Pratt V, Davis K

    Challenges facing middle management in the 1980's and beyond are not confined to business matters such as industrial relations, government and legal constraints, corporate takeovers, and comm

    Jan 1, 1986

  • AUSIMM
    Ventilation of Single Entry Developments at Ellalong Colliery

    By Wallman D

    Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam

    Jan 1, 1983

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967