Ventilation of Single Entry Developments at Ellalong Colliery

The Australasian Institute of Mining and Metallurgy
Wallman D
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
14
File Size:
482 KB
Publication Date:
Jan 1, 1983

Abstract

Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam using a Dosco In-Seam Miner (I.S.M.). Ventilation of the drivage was accomplish- ed by an exhausting fan in series with steel ducting and flexible ducting in the immediate face area. The air quantities provided at the face were more than adequate to comply with the requirements of -the auxiliary fan rules and the Coal Mines Regulation Act, 1912, as amended. The experience gained in these drivages demonstrated that the ventilation of long single entry headings can be practically and safely achieved using existing equipment.
Citation

APA: Wallman D  (1983)  Ventilation of Single Entry Developments at Ellalong Colliery

MLA: Wallman D Ventilation of Single Entry Developments at Ellalong Colliery. The Australasian Institute of Mining and Metallurgy, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account