Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geological of Coal Seam Roof Conditions in the Southern Coalfield of New South Wales

    By Wilson R. G

    Mining conditions imposed by a coal seam roof can be analysed according to natural causes, before consideration of strata control. All types of roof behaviour can be explained by considering only t

    Jan 1, 1976

  • AUSIMM
    Some Aspects of Technological Development in Aluminium Smelting

    The evolution of Hall process alumina reduction technology is des- cribed with particular attention to the pot lines. Future directions of tech- nological change are considered. It is predicted that

    Jan 1, 1982

  • AUSIMM
    Geology of Western Australian Tin Deposits

    Western Australian tin deposits are similar to those of other Precam- brian terrains in that they are mainly associated with rare-metal pegmatites, in which cassiterite is found with minerals conta

    Jan 1, 1973

  • AUSIMM
    Predicting the Efficiency of Chemical Processes for Low-Grade Concentrates and Ores

    By Prosser AP

    The large body of knowledge about the relation between chemical process efficiency and mineralogical features is of only limited use. The profession ought to try to improve the methods of using inf

    Jan 1, 1975

  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits

    By A Melkumyan, K Silversides

    The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.

    Nov 24, 2014

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Roof Support of Square Pillar Extraction Systems

    General design of pillars to ensure a continuing roof support during ex- traction is discussed. Practical problems associated with pillar extraction are Outlined.

    Jan 1, 1974

  • AUSIMM
    Distinct Element - Structural Element Analysis of Support Systems in Jointed Rock Masses

    The objective in design of an excavation in a jointed rock mass is to achieve a prescribed degree of control of rock mass displacement around the excavation. Any excavation in jointed rock usually

    Jan 1, 1987

  • AUSIMM
    Comparison of Ethyl Xanthate and Diisobutyldithiophosphinate Collectors for the Lead Roughing of the Hilton Ore of Mt Isa Mines Ltd

    By Johnson N. W, Ralston J, Lauder D. W, Smart St C R

    The flotation behaviour of the Hilton ore of Mount Isa Mines has been examined in the presence of two collectors (sodium ethyl xanthate (Ex) and sodium diisobutyldithiophosphinate (3418A)) over a ra

    Jan 1, 1991

  • AUSIMM
    A Full Scale Coke Oven and Blast Furnace Trial with Bentonite Coke

    A nine-month investigation was conducted into the effect on coke quality and blast furnace operation of the addition of bentonite and southern coal to the northern coal fed to the coke ovens at the Ne

    Jan 1, 1962

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Preparing for Progressive Mine Rehabilitation Sign-off in Queensland

    By P Swart, A Fletcher, P D. Erskine

    Glencore Coal Assets Australia (GCAA) operates five coalmines in Queensland and has rehabilitated thousands of hectares of mined land across these sites. Accordingly, GCAA seeks to continually improve

    Jun 28, 2016

  • AUSIMM
    Residue Treatment Plant Practice at Risdon, Tasmania

    By Garrigan J. S, Oakes I

    Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl

    Jan 1, 1977

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    Definition of Higher Grade Ore and Selective Mining Practices at Olympic Dam

    By Smith R. N

    The Olympic Dam copper-uranium-gold-silver deposit is located approximately 520km north-northwest of Adelaide, South Australia. The deposit was discovered in 1975 by the Exploration Division of Wester

    Jan 1, 1990

  • AUSIMM
    A New Concept in Mechanical Drives-The WABCO 120 Mechanical Truck

    This paper briefly reviews the history of mine haulage trucks. It reviews producti- vity limitations with respect to size or speed. Changing haul requirements once again create the need for more fle

    Jan 1, 1981

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Blind Shaft Drilling of the Agnew Mine No. 1 Ventilation Shaft

    The Agnew Mine No. 1 Ventilation Shaft is the largest diameter shaft blind drilled in a hard rock mining environment. The selection of this method of shaft development was based on achieving an a

    Jan 1, 1983