Residue Treatment Plant Practice at Risdon, Tasmania
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 11
- File Size:
- 265 KB
- Publication Date:
- Jan 1, 1977
Abstract
Current operating practice in a plant commissioned some five years ago to treat  ferritic zinc plant residue by the "Jarosite"  process is described. Major problems overcome  include obtaining reliable pH measurements at  100¦C, prevention of scale build up in spent  electrolyte heaters, blinding of jarosite  filter cloths and the deposition of gypsum in  filter presses.
Citation
APA: (1977) Residue Treatment Plant Practice at Risdon, Tasmania
MLA: Residue Treatment Plant Practice at Risdon, Tasmania. The Australasian Institute of Mining and Metallurgy, 1977.
