Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Partial Recirculation in Mine Ventilation

    A brief review of the problems in ventilating and cooling deep and hot Australian mines is presented. An overview is given on the development of the controlled partial recirculation concept. The mai

    Jan 1, 1994

  • AUSIMM
    Grade Modelling Reconciled to Open Pit Mining at the Golden Plateau Mine, Cracow, Queensland

    The Golden Plateau Mine is located at Cracow in central Queensland, 350 kilometres north west of Brisbane. The mine was operated by Golden Plateau NL as an underground mine from 1933 to 1976 with a

    Jan 1, 1994

  • AUSIMM
    Development and Economic Application of Knelson Concentrators in Low Grade Alluvial Gold Deposits (The AuslMM Annual Conference Rotorua, New Zealand 1990)

    By Edwards R

    Greater efficiency of capture of minus 6 mm to fine micron size particles of free gold is achieved with the Knelson Concentrator. The development, principles of operation and recent innovations relati

    Jan 1, 1990

  • AUSIMM
    Geotechnical Factors Contributing to Stockpile Slope Stability

    By Patridge A. C

    Observations of coal stockpiles subject to unusual levels of instability showed that the particular coals exhibited 'gap grading', a relative lack of intermediate size particles. This led

    Jan 1, 1995

  • AUSIMM
    Evidence for, and Implications of,a Genetic Relationship Between MVT and SEDEX Zinc-Lead Deposits

    Mssissippi Valley-type (MVT) and sedimentary-exhalative (SEDEX) zinc-lead deposits represent about half to three-quarters of the world's production and reserves of lead and zinc. The two deposi

    Jan 1, 1993

  • AUSIMM
    Characteristics of Low Sulphidation Gold-Copper Systems in the South-West Pacific

    By Corbett GJ

    Magmatic-related low sulphidation hydrothermal ore systems at plate margins exhibit distinct spatial and temporal zonations which can be used to aid mineral exploration and development. Low sulphidat

    Jan 1, 1995

  • AUSIMM
    Monitoring Rock-Support Interaction Around Tunnels

    By Thompson AG, Cadby GW

    The New Austrian Tunnelling Method (NATM) is a proven concept for the safe and economic construction of underground facilities. This is especially true for tunnelling activity where changing groun

    Jan 1, 1987

  • AUSIMM
    Some Consideration on Tunnel Excavation Methods in Mudstone Strata

    By Yagi Y

    The double track railway tunnel, called the Second Shirasaka Tunnel is being constructed under the supervision of Japanese PTational Rail- ways (JNR) in the tertiary soft rock strata in order to spe

    Jan 1, 1987

  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • AUSIMM
    Resources and Reserves at Z.C. Mines Broken Hill

    By Hulton SJ, MacKenzie DH

    The Broken Hill orebody within the leases of ZC Mines is still a major lead-silver-zinc resource after over 80 years of mining. It illustrates particular problems encountered in resource and reserve

    Jan 1, 1987

  • AUSIMM
    A short review – hydrogen reduction of copper-containing resources

    By M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis

    The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,

    Jun 19, 2024

  • AUSIMM
    Effects of Acidity on Bacterial Sulfate Reduction and the Bioprecipitation of Metals in Groundwater

    By B M. Patterson, A J. McKinley, M E. Grassi

    Large-scale column experiments were undertaken to determine the effect of a step decrease in groundwater pH on metal remediation by bioprecipitation. Metal contaminated groundwater at pH 5.5 was amend

    Jan 1, 2004

  • AUSIMM
    Geostatistical Parametrisation for Grade Control of Stratiform Banded Iron Formation in 'Singhbhum - Keonjhar - Bonai' Belt of India

    By Sarkar B. C, Sen A. K

    India is well endowed with vast reserves of banded hematite ore, about 12 billion tonnes, estimated by some conventional methods. Various authors have assessed this huge reserve using some advanced

    Jan 1, 1995

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • AUSIMM
    Explosibilities of Selected Queensland Bowen Basin Coal Dusts

    By Jensen B

    The investigation of the explosion characteristics of nine Bowen Basin (Central Queensland) dust samples in a suitable coal dust explosion chamber using a new dust concentration probe provides several

    Jan 1, 1991

  • AUSIMM
    Waste Processing in the Zinc Industry Using Ausmelt Technology

    By Robbilliard K. R, Floyd J. M

    The problems facing the metallurgical industry from the viewpoint of the range of unacceptable residues, flue dusts and slags currently produced from the electrolytic zinc process, electric arc furn

    Jan 1, 1993

  • AUSIMM
    Brecciation, Mineralisation and Alteration of the Kidston Gold Deposit

    The Kidston breccia pipe is situated approximately 280 km west northwest of Townsville, north Queensland. It is currently Australia's largest gold producer with production varying between 8,0

    Jan 1, 1987

  • AUSIMM
    State-of-the-art of electroslag refining and challenges in the control of ingot cleanness

    By G Stovpchenko, G Jianjun, L Medovar

    Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti

    Jun 19, 2024

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003