Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021

  • AUSIMM
    A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, Sweden

    By R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian

    Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v

    Aug 24, 2022

  • AUSIMM
    Evaluation of CAVEX Hydrocyclone in the Ok Tedi Grinding Circuit

    Ok Tedi Mining Limited has recently completed the first phase of a trial to compare the performance of D26B Krebs cyclones in different configurations to the new Warman 650 mm CAVEX cyclones. From 199

    Jan 1, 2000

  • AUSIMM
    Resources and Reserve Assurance Processes – a Framework for Improved Governance

    By L J. de Lange

    As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur

    Jun 22, 2016

  • AUSIMM
    Using Life Cycle Assessments and Multi-Criteria Decision Analysis Models for Ex Ante Sustainability Assessment

    By G A. Blengini, S V. èolar

    The minerals industry is faced with choices beginning in the exploration phase and extending over the life cycle of the mine. Firms examine the technical feasibility of alternative actions and typical

    Jan 1, 2009

  • AUSIMM
    Some Notes on Diamond Drilling Practice at Mount Isa

    The Black Star lead and zinc ore-bodies, situated in the western zone of mineralisation at Mount Isa occupy an area 2000 ft. long with varying widths from 100 ft. to 300 ft. The strike is N5°W, a

    Jan 1, 1932

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    Experiments on Rock Burst and its Control

    By L R. Sousa, M He

    Rock burst is common in deep underground excavations and is characterised by a violent ejection of block rocks from excavation walls. It is critical to understand the phenomenon of rock burst and part

    Nov 5, 2014

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Application of Heterogeneity Testing to Coarse Gold Ores

    By S C. Dominy, R C. A Minnitt

    Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d

    Aug 21, 2012

  • AUSIMM
    Ultrastand - An Innovative Cable Bolt

    Cable bolts are being used more extensively by the mining industry for many different rock reinforcement applications. The configuration of these bolts has evolved over the last 20 years to meet the i

    Jan 1, 1992

  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017