Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Equação De Correlação Com Enfase Na Litologia Para Estimativa De Resistência À Compressão Uniaxial Através Do Uso De PunditBy Nei Bongiorni Alff de Freitas
O uso de velocidade de onda sônica tem ganhado espaço na estimativa de resistência à compressão uniaxial (UCS) por ser um método mais barato, rápido e não destrutivo em comparação com o método tradici
Oct 30, 2017
-
Physiological Analysis Of Human Generated Heat In A Refuge AlternativeBy T. E. Bernard
Occupying a refuge alternative (RA) is an accepted practice in mine fires and explosions when escape is not feasible. MSHA has promulgated a final rule on refuge alternatives that includes a recogniti
Feb 27, 2013
-
Reservoir Engineering – General - A Comparison of Calculated krg /k16 Ratios with a Correlation of Field DataBy M. R. J. Wyllie, Michael A. Torcaso
With the continued deep drilling of today, increasing numbers of high pressure and high temperature gas-condensate reservoirs are being discovered. Correspondingly, the ranges of properties of gas-con
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
Ore reserves: errors and classificationErrors in ore reserve estimation can occur during drilling and sampling, sample preparation and analysis, geological logging and modelling, database construction, statistical or geostatistical evaluat
Dec 1, 1996
-
IC 7685 Administration Of The Federal Coal Mine Safety Act ? IntroductionBy James Westfield
This report covers the calendar year 1953 and has been prepared and submitted in accordance with the provisions of Sec. 106(a) and Sec. 212(c) of the Federal Coal Mine Safety Act (66 Stat. 692; 30 U.S
Jan 1, 1954
-
Changes In The Seismic Properties Of The Cover Produced By Longwall MiningBy Guoqi He
Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within
Jan 1, 1989
-
Application Of The Split-Online Sag Feed Size Analyzer At P.T. Freeport IndonesiaBy A. Supomo, A. Partanen, M. Mular
Although many SAG operators may agree that on-line measurement of SAG feed-size is an attractive notion, applying this information in a control strategy that recovers the investment, engineering time,
Jan 1, 2001
-
Paste Fill Design at the Louvicourt MineBy Pierre Lacombe
"The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be
Jan 1, 1995
-
Underground DamsThe limit of pressure to which an underground dam may with safety be subjected, is a question that-as far as the writer knows has not received the same attention from authorities on engineering constr
Jan 1, 1901
-
Investigations of Massive Sulphide Mineralisation Along the Kermadec Arc 1996 - 2005By G J. Massoth, K Faure, A G, R G. Ditchburn, I J. Graham
From modest beginnings in 1996, research into the mineral potential of New ZealandÆs Exclusive Economic Zone has progressed into a major multidisciplinary component of GNSÆs recently funded 6-year æMi
Jan 1, 2005
-
IC 7355 Geophysical Abstracts 123 October-December 1945 - With An Index To Abstracts 120-1238186. Aquilina, C. Determinazioni relative di gravita eseguite nel 1939 (Relative Determinations of Gravity Made in 1939), Ric. Ingegn, Rome, vol. 10, 1942, pp, 6376. In 1939, the author made a sur
Jan 1, 1946
-
Hydrothermal Alteration in the Gladstone Hilliow-Suifidation Epithermal Area, Waihi, New ZealandBy J L. Mauk
Gladstone Hill, a volcanic-hosted low-sulfidation epithermal prospect in the Coromandel Peninsula, is less than 1 km from the world-class Martha Hill Au-Ag deposit. Gold-silver-bearing quartz veins oc
Jan 1, 2001
-
On Localizing Uniform Conditioning EstimatesBy O. Rondon
Localized uniform conditioning is a technique developed to spatially locate selective mining unit grades that have been derived using uniform conditioning for the assessment of recoverable resources.
Jan 1, 2014
-
Entrenamiento de seguridad. Base de buena supervisiónBy Oswaldo Ortíz Sánchez
El objetivo del texto es señalar el concepto de entrenamiento y cuáles son las necesidades básicas del supervisor dentro de una industria minera. Para ello es necesario definir el entrenamiento como u
Aug 20, 1965
-
"Modelización para el confort y calidad ambiental en la atmósfera subterránea basado en los riesgos ambientales"By Vidal Navarro
Actualmente el enfoque sobre los problemas ambientales no se puede desligar de la seguridad y salud ocupacional. Por ello, es necesario desarrollar una reingeniería en el aspecto ambiental subterráne
Aug 25, 2002
-
RI 4189 Cle Elum Iron-Nicke Deposits Kittitas Co., WABy S. W. Zoldok
"ERRATUMFor paragraph 1, page 1, read the following:The Cle Elum nickeliferous iron deposits occur on an unconformable contact between the serpentine and overlying Swauk sandstone formation and extend
Feb 1, 1948
-
A 4.75m Contractor Manufactured EPB MachineBy Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008