The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia MineBy J. Krzyzanowska
Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current
Jan 1, 2007
-
Advanced Mill Relining ? A Key Operational Control (Not Simply A ?Must Do? Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RME's fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill vol
Jan 1, 2007
-
A Touch of Froth: How Bubble-Particle Aggregates Take the StrainBy Marco A. Vera
"This paper investigates the froth function in flotation and the associated upgrading process. Flotation literature has revealed that one of the main functions of the froth phase is the cleaning of bu
Jan 1, 2003
-
Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite FlotationEffect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation
Sep 13, 2010
-
Extruded Concrete Lining—The Future Lining Technology for Industrialized TunnellingBy Siegmund Babendererde, Jan O. Babendererde
Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct
Jan 1, 2001
-
Using Steel Fibers to Reinforce Final Shotcrete LiningsBy Thomas Schwind, Pamela S. Moran
For short tunnels, a reinforced cast-in-place lining is not economical and shotcreteis a logical substitution. In the past, reinforced shotcrete linings have been constructed with lattice girders and
Jan 1, 2005
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*By M. Vallée
"RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l
Jan 1, 2005
-
Tratamento Químico Superficial De Fibra De Sisal: Melhorias No Desempenho Mecânico De Compósitos Semi-ecológicos Sisal/poliésterBy Jayna Kátia Dionisio dos Santos
Os materiais compósitos tornaram-se ao longo dos últimos anos, essenciais ao surgimento de novas tecnologias. Para tanto, é imprescindível que alguns cuidados sejam considerados ao desenvolver estes m
Aug 8, 2018
-
Cathodoluminescence Mineralogy of Ceramic Build-ups in Channel Induction FurnacesBy Musa Karakus
Ceramic build-ups are synthetic mineral deposits formed in critical locations in or near the throats of inductor units in channel induction furnaces, the preferred melting and holding furnaces used in
Jan 1, 1989
-
Ventilation rules of thumb – friend or foe? Focusing on design upcast air velocities for shafts and raise boresBy A S. Derrington
There are several long-standing rules of thumb that are often quoted in mine ventilation studies. They include airway ‘carrying velocities’ and the critical upcast air velocity range that must be avoi
Aug 28, 2017
-
RI 6235 Water-Swelling Synthetic Fluormicas And FluormontmorillonoidsBy Robert C. Johnson
Water-swelling fluormicas and fluormontmorillonoids were synthesized and described. They were found predominantly in the system Mg0 - MgF2 - Si02, with varying amounts of Li+ or Na+, Some water-swelli
Jan 1, 1963
-
Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable DevelopmentOperating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed
Jun 1, 2010
-
Lowered Expectations: The Impact Of Yield Stress On Sand Transport In Laminar, Non-Newtonian Slurry Flows (db234ae4-9636-4048-baa8-d2e179ef9ec7)By R. G. Gillies
The pipeline transport of paste, backfill or thickened tailings slurries is an important component of the tailings disposal process in many mines around the world. These mixtures contain significant f
Jan 1, 2007
-
Estudo Do Emprego De Materiais Sinterizados Submetidos A Extrusão A MornoBy Matheus Fortes Stiborski
O emprego de materiais sinterizados para conformação massiva permite a utilização de forças menores permitindo que resultados similares sejam alcançados com maquinas de potência menor, outra vantagem
Aug 17, 2017
-
IC 8686 Noise Control - Proceedings: Bureau Of Mines Technology Transfer Seminar, Pittsburgh, Pa., January 22, 1975Research workers From the Bureau of Mines and industry met with other government and industry representatives in Pittsburgh, Pa., on January 22, 1975, to discuss the results of research under the Bure
Jan 1, 1975
-
Alluvial Gold Adjacent to Glacial Margins, West Coast, South Island, New ZealandA substantial proportion of current and historic West Coast gold production comes from deposits situated around the margins of æice ageÆ glaciers. Gold has been eroded and transported by glacial ice t
Jan 1, 2000
-
Designing for Upper Seam Stability in Multiple Seam MiningHistorically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume
Jan 1, 1986
-
Salt Lake City Paper - Flotation Practice in the Coeur d'Alene District, Idaho (with Discussion)By A. W. Fahrenwald
Flotation practice in Idaho is now about 13 years old. The advance has been steady during these 113 years. The operators have been alert to take advantage of the newest developments and they have them
Jan 1, 1928
-
OFR-153-77 Technical And Economic Feasibility Surface Mining Coal Deposits North Slope Of AlaskaThis Kaiser Engineers report on the feasibility of surface mining on the North Slope of Alaska has considered the quantity and quality of the North Slope deposits with attention paid to the economic,
Jan 1, 1977