Search Documents

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • CIM
    The Ontario Securities Act

    By W. E. Segsworth

    Introduction By far the largest part of the money raised for mining is raised by honest and legitimate means; but a not inconsiderable amount is raised by fraudulent sales methods. It will be conced

    Jan 1, 1934

  • NIOSH
    References And Footnotes - Photographic Credits

    REFERENCES AND FOOTNOTES 1. U.S. Department of the Interior, Office of Surface Mining. Surface Coal Mining Reclamation: 10 Years of Progress: 1977-1987. Washington, D.C. August 3, 1987.48 pp. (For sa

    Jan 1, 1992

  • AUSIMM
    Notes on Lake Margaret Hydro-Electric Power Scheme.

    LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and

    Jan 1, 1915

  • ABM
    Ensaios De Tração Comparativos Entre Compósitos Reforçados Com Curauá E Compósitos Reforçados Com Fibras De Vidro

    By Luís Carlos da Silva

    Atualmente, uma das principais preocupações da humanidade está relacionada à questões ambientais, que motivam pesquisas para o desenvolvimento de materiais com recursos renováveis e amigáveis com o me

    Oct 30, 2017

  • SME
    Thermal and Mechanical Activation in Acid Leaching Processes of Non-bauxite Ores Available for Alumina Production—A Review Mining, Metallurgy and Exploration

    By Murat Erdemoğlu, Turan Uysal, Thierno Saidou Barry, Mustafa Birinci

    The rapid development of the global alumina and aluminum industry is straight coupled with the demands and the needs of these materials. Nowadays, the only well-known accessible resources to produce a

  • NIOSH
    RI 9330 - Sealed Flask Test for Evaluating the Self-Heating Tendencies of Coals

    By Yael Miron

    This report describes laboratory studies by the U.S. Bureau of Mines to determine the suitability of a static oxygen (OJ adsorption test for evaluating the self-heating tendencies of coals. Reliable m

    Jan 1, 1990

  • SME
    Sampling Methods for Seamount Cobalt-rich Crusts and Determination of the Minimum Reliable Assay Sample Quantity

    By Xuehua Zhang, Shengxiong Yang, Huiqiang Yao, Gaowen He

    "Seamount cobalt-rich ferromanganese crusts (hereafter crusts) are authigenic iron/manganese hydroxide/oxide deposits formed from direct precipitation of minerals from seawater onto a hard substrates

    Sep 1, 2014

  • IIMP
    Determinación petrográfica del cuarzo en polvos de la industria minera

    By Aníbal Gatañaga Coll

    Dada la peligrosidad del sílice libre como principal problema en el campo de la higiene industrial, el objetivo del trabajo es controlar y evaluar la concentración de dichos polvos a través del uso de

    Jul 20, 1955

  • IIMP
    Barrenos de perforación con collarines de jebe

    By Max Moya Bendezú

    "El presente texto analiza algunos problemas inherentes a la fabricación de barrenos integrales, así como presenta una posible solución a los mismos. Los barrenos de perforación con collarines de jebe

    Sep 1, 1968

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • AUSIMM
    The Determination of Platinum in Ores and Mineral Concentrates

    An assessment of methods currently available for the accurate determination of low concentrations of platinum in ores and mineral concentrates indicated that prior treatment of the sample by fire assa

    Jan 1, 1970

  • IIMP
    Voladura en gran escala mejora obtención de material para relleno en Orcopampa

    By Gregorio Llanos Villarreal

    Dado que la expansión progresiva de la mina Calera exige una productividad de material detrítico, se ha optado por una alternativa de voladuras a gran escala que controle el desmonte proveniente de l

    Apr 1, 1991

  • ABM
    Revamp Do Sistema De Controle De Um Laminador De Barras E Rolos

    By Alexandre Schultz Rizek

    Esse projeto visou a substituição do sistema de controle instalado por um padrão RUSSULA, sistema esse que controla um laminador de barras e de rolos de 500.000 toneladas/ano na Usina Presidente Varga

    Aug 17, 2017

  • NIOSH
    OFR-87-80 A Technical Basis For The Development Of Deep Ocean Mining Regulations

    By Philip B. Grote

    The deep ocean mining industry is in a pre-commercialization stage of development. In the context of a proper legal/regulatory regime, deep ocean mining system design, site survey, and operation techn

    Jan 1, 1979

  • AUSIMM
    Spodumene: A Mineral Source of Lithium

    By Elliott A, Kingsnorth D. J

    The development of a large high grade spodumene orebody, in excess of 30M tonnes containing at least 7M tonnes at 4.0% Li20, by Lithium Australia Ltd at Greenbushes, Western Australia is significan

    Jan 1, 1989

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • IIMP
    La industria del acero en México

    By César Sotillo

    "El presente texto describe el proceso de la industria del acero en México. La compañía fue fundada en el siglo XX y tiene sus altos hornos en Monterrey, capital del estado Nuevo León, donde se funden

    May 1, 1953