Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Triz Aplicado Ao Processo De TrefilaçãoBy Guery Augusto Echeverria Martínez
O profissional brasileiro tem uma grande capacidade em criar soluções. Na área de trefilação o resultado desta criatividade é facilmente encontrado em diversos pontos do processo. No entanto esta capa
Aug 16, 2017
-
RI 7699 Experimental Investigations Of An Open-Cycle, Vortex MHD GeneratorBy George J. Conroy
Electrical power generation was studied in a laboratory-scale, open-cycle vortex MHD generator, which offers several advantages over straight-channel generators that require separate combustors. Compa
Jan 1, 1972
-
Broadening Engineering CurriculaBy C. L. Dake
AN insistent and steadily growing demand is evident for the broadening of undergraduate curricula in engineering. Among suggested additions are training in public speaking, report writing, business la
Jan 1, 1934
-
Aspects Of Time-Dependent Deformation In Hard Rock At Great DepthBy K. Drescher
Excavations in deep level hard rock mines show rheological or time-dependent deformation responses to mining-induced stresses. These are generally not as dramatic as those seen in soft rock environmen
Jan 1, 2003
-
IC 8551 Bureau Of Mines Energy Program, 1971 ? IntroductionBy John D. Spencer
Clean energy production from coal, oil, and gas, and the development of these and other energy sources continued to be a major objective of the energy research program of the Bureau of Mines.3 In 1971
Jan 1, 1972
-
A Robust Chemically Enhanced Electrostatic Separation TechnologyA Robust Chemically Enhanced Electrostatic Separation Technology Physical separation processes such as gravity, magnetic and electrostatic separations are extensively used in heavy minerals separatio
Sep 13, 2010
-
The Impact Of Platinum Production From UG2 Ore On Ferrochrome Production In South Africa (28793553-1165-4bde-b447-a1dd7203cf06)By L. A. Cramer
South African platinum mines produce the world?s majority of platinum metal that is used in autocatalysts and jewellery. As the platinum market is forecast to grow at healthy rates into the future, th
Jan 1, 2004
-
RI 8529 Dewatering Florida Phosphatic Clay Wastes With Moving ScreensBy L. W. Brandt
The Bureau of Mines, as part of its mission to effect pollution abatement, conducted research to study various means of dewatering Florida phosphatic clay wastes and reclaiming mined lands. The work w
Jan 1, 1980
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and ConstructionBy F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003
-
Robótica Na MineraçãoBy Eduardo Cota
Graças à miniaturização e aumento na robustez de equipamentos eletrônicos, a robótica tem estendido as suas aplicações até às mais diversas áreas. Atualmente a mineração possui muitos desafios a serem
Oct 30, 2017
-
Use Of Charcoal In Silicomanganese ProductionBy M. Tangstad, B. Monsen, H. Midtgaard
The increased attention towards reducing emissions of fossil CO2 due to its potential global warming effect has resulted in a focus on renewable resources, as charcoal. Since charcoal is produced from
Jan 1, 2004
-
Managing Challenges Faced in the Brownfield Commissioning of an Ultra-Fine Hematite Processing Circuit at ArriumÆs Iron Duke Ore Beneficiation PlantBy E Selvapandian, R Barr
Arrium (previously OneSteel) initiated a desktop study into the performance of its hematite ore beneficiation plant in early 2010. The beneficiation plant utilises jig concentrators and spirals to upg
Aug 12, 2013
-
Application of Multiple Excavation Support Systems in Brown Field ProjectBy Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with
Jan 1, 2017
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
OFR-151(2)-83 Development Of A Procedure For Land Use Potential Evaluation For Surface-Mined Land - Appendix I: Eastern U.S. Surface Mine Case StudyBy Raja V. Ramani
The potential usefulnuss of reclaimed surface-mined land has received much attention in recent times. This attention is partially due to the establishment of federal environmental reclamation standard
Jan 1, 1983
-
Inteligencia artificial - redes neuronales artificiales y su aplicación en la predicción de las variables en planta concentradoraBy Cristhian Carrión
El trabajo evalúa la aplicación de la Inteligencia Artificial (IA) o Redes Neuronales Artificiales (RNA) en el procesamiento de minerales, con el fin de predecir y optimizar recuperaciones. El estudio
Sep 20, 2019
-
Building the Next Major Iron Ore Mine in the Labrador TroughCertain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu
May 1, 2011
-
EPB TBM Tunnelling in Singapore Old AlluviumBy N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan
In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system
Jan 1, 2005
-
Maximizing Ore Extraction at Brunswick MineBy Barara Rose
Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions
Oct 1, 2010
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003