Search Documents

  • ABM
    Melhorias No Projeto De Fundição Das Caixas De Refrigeração Do Alto Forno Da Arcelormittal Aços Planos América Do Sul

    By Vander de Angeli

    Em 2014 houve necessidade de substituição precoce de Caixas de refrigeração no Alto Forno devido a vazamentos provocados por defeitos de fundição ocasionando perda de produção. Após análise das falhas

    Aug 16, 2017

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • SAIMM
    New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)

    By M. Hopf

    The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper

    Jan 1, 2006

  • SAIMM
    Application Of Ecosystem Function Analysis (EFA) In Assessing Mine Tailings Rehabilitation: An Example From The Mhangura Copper Mine Tailings, Zimbabwe

    By G. M. Dowo

    The widespread environmental damage caused by slimes dam construction requires rehabilitation as one of the key management strategies towards land restoration. From the time when Mhangura Copper Mine

    Dec 1, 2013

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • NIOSH
    Mechanical Concentration Of Gases - I. Introduction

    The problem of separating the constituents of a mixed gas has assumed increasing importance to chemical technology during the last several decades. Metallurgical practice, dealing mostly with the appl

    Jan 1, 1940

  • ABM
    Estudo Do Efeito De Ciclos De Molhagem E Secagem Na Durabilidade De Argamassas Com Adição De Resíduo Da Produção De Papel

    By Afonso Rangel Garcez de Azevedo

    A produção de papel gera grande quantidade de resíduo em diferentes etapas da produção, constituído basicamente de celulose e caulim, que atualmente não tem um destino adequado e acaba gerando custos

    Oct 30, 2017

  • SAIMM
    Shotcrete Lining Of South Deep Shafts

    By W. P. Erasmus

    This paper will focus on the use of the ?wet-mix? steel fibre re-in forced shotcrete as a permanent lining in deep shafts, assessing gold bearing reef. It will cover all aspects relating to the choice

    Jan 1, 2001

  • AIME
    Chicago, Ill Paper - Discussion of Mr. P. G. Salorn's Paper on "Physical and Chemical Tests of Steel for Boiler and Ship-Plate for the United States Government Cruisers,"

    William Kent, New York City: I regret that I have not had the time since the Cincinnati meeting to make as complete a study of Mr. Salom's paper as I wished. I regard it as one of the most import

    Jan 1, 1885

  • SAIMM
    A Review of Current Tunnelling Technology and Boring Applications in Mining and Infrastructure Development - An EPCM Perspective

    By S. C. Gouws

    "SynopsisSustainable infrastructure development has long been identified as a key enabler for socio-economic growth and poverty reduction in societies globally. Twenty-one years into the young South A

    Jan 1, 2015

  • SAIMM
    Practices And Design For Extending The Hearth Life In The Mittal Steel Company Blast Furnaces

    By W. Carter, P. Chaubal, K. Spaleck, M. Schoeman, J. Bobek, W. Seegers

    Keywords: Pyrometallurgy, steel, hearth, blast furnace The Mittal Steel Company operates about 36 blast furnaces on four continents. Furnaces range from 1100 m3 to 4800 m3 inner volume. The focu

    Jan 1, 2006

  • AUSIMM
    Investigations on Wire Ropes in Mine Hoisting Systems

    Wire rope, when used for hoisting on a mine is one of the most vulnerable units in the most expensive group of installations on the mine. With the introduction of hoisting on the Koepe sheave, a new t

    Jan 1, 1965

  • AIME
    Part IX - Papers - Metallothermic Reduction of Oxides in Water-Cooled Copper Furnaces

    By Fred H. Perfect

    The thermite process, now approximately 80 years old, has heretofore been practiced in ceramic vessels. This paper outlines the successful production of several million pounds of alloy produced in zua

    Jan 1, 1968

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • ABM
    Soldabilidade Do Aço Estrutural En 10025-4 S355m Na Fabricação De Torres Eólicas

    By Leonardo de Oliveira Turani

    A energia eólica, fonte de energia renovável e de baixo impacto ambiental, vem crescendo rapidamente na última década, em especial no Brasil. A conversão da energia cinética dos ventos em energia elét

    Aug 8, 2018

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data

    By Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami

    For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve

    Jan 1, 2007

  • SME
    Critical Review Of Numerical Stress Analysis Tools For Deep Coal Longwall Panels Under Strong Strata - Preprint 09-011

    By M. K. Larson

    Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element

    Jan 1, 2009