Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in GroundwaterBy J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry
"Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,
Jan 1, 2016
-
Peabody's Camoy System - "True Continuous Coal Mining" - SummaryBy J. A. L. Campbell
Peabody's Camoy mining system is a truly continuous conceptual method of underground mining of coal. The system solves the three factors which limit coal from being mined continuously. Camoy&apos
Jan 1, 1976
-
Espejo de Tarapacá: An Innovative Pumped Hydro Storage Facility in Chile with Many Challenges from a Rock Mechanical Point of ViewBy T. Marcher, C. Mathiesen, M. Allende, S. Bauer
"A unique pumped hydro storage facility using the ocean as a lower reservoir, combined with solar PV to create consistent, clean power will be presented: the Espejo de Tarapacá Project is comprised of
Jan 1, 2016
-
Adsorption - IntroductionBy Fathi Habashi
THE UNIT process of adsorption involves two steps: 1) Loading of the adsorbent. 2) Recovery of metal values from the adsorbent. Charcoal is the adsorbent commonly used in extractive metallur
Jan 1, 1970
-
Mill Expansions At P.T. Freeport IndonesiaBy R. L. Russell
Production at Freeport Indonesia's Ertsberg open pit copper/gold mine started in 1972 at a rate of 7500 t/d. Mill throughput remained at that rate for a number of years until the discovery of the
Jan 1, 1994
-
The Interaction between Cations in Saline Water and Calcium Bentonite in Copper Flotation "Mining, Metallurgy & Exploration (2021)"By Siyu Song, Yanhong Wang, Guohua Gu, Linbo Huang
In this study, the effect of cations, Na+ and Mg2+, in saline water on copper flotation in the presence of calcium bentonite was investigated. It was found that as the concentration of NaCl was increa
Sep 10, 2020
-
SFRC Segmental Lining Design for a Pressurised TunnelBy Sotiris Psomas, Colin M. Eddie
"Steel Fibre Reinforced Concrete (SFRC) Segmental Tunnel Linings have successfully been used for over 20 years in the UK and have been adopted in a number of high profile projects such as High Speed 1
Jan 1, 2016
-
Main Pass – Frasch Sulphur Mine DevelopmentBy John M. Ackerman
In the spring of 1988, Freeport-McMoRan Resource Partners Ltd. Partnership, IMC Fertilizer Inc. and Homestake Mining Co., as joint venturers, were awarded the sulphur lease for Main Pass Block 299, le
Jan 1, 1992
-
Air Toxics Regulations Under the Clean Air Act AmendmentsBy Gale F. Hoffnagle
INTRODUCTION On November 15, 1990, President Bush signed the Clean Air Act Amendments of 1990. These Amendments cover many aspects of air pollution control. The provisions which seek to control emi
Jan 1, 1991
-
Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026By C. H. Stephenson, Z. White
This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio
Feb 22, 2026
-
DSU TBM for Vishnugad Pipalkoti - TBM Design Development for Large Diameter Rock Tunnels under the High Covers of the HimalayaBy Remo Grandori
"INTRODUCTIONDouble Shield TBMs were introduced in the market in the early seventies with three main targets:• Increase the TBM performances in term of advance per day thanks to the ability to erect a
Jan 1, 2016
-
Effects Of Shield Tunneling Over SubwaysBy Eugene F. Casey, William H. Hansmire, J. Ghaboussi, Randall L. Lentell, Harvey W. Parker
INTRODUCTION Construction of a major intercepting sewer in Brooklyn, New York involved tunneling in soil over several subway lines. In two instances the clearance between the subway and sewer was s
Jan 1, 1981
-
Intelligent Sensor Data Analysis Using A1 Based TechniquesBy Paul J. A. Lever, Robert H. King
Human operators, geological conditions, equipment changes, mining sequences, and roof conditions are some of the continually changing operating conditions that drive a dynamic mining environment. Thes
Jan 1, 1993
-
Influence Of Microscopic Structure Of Coal On Methane MigrationBy Satya Harpalani
An investigation was carried out to study the microscopic structure of coal in order to understand the phenomenon of methane migration. A Scanning Electron Microscope (SEH) was used to study the surfa
Jan 1, 1987
-
Three-Dimensional Slope Stability Analysis of Block Sliding Slope Failure at the Pikeview Quarry, El Paso County, ColoradoBy J. A. Cremeens, D. D. Overton, J. C. Varnier
"Slope failures that occurred in 2008 and 2009 at the Pikeview Quarry in El Paso County, Colorado, USA were investigated using three-dimensional discrete element modeling methods. Large scale block sl
Jan 1, 2017
-
A Study On Grinding And Energy Input In Stirred Media MillsGrinding and energy input in stirred media mills are studied as functions of grinding time, stirring speed, media size and density, solid concentration, impeller and tank dimensions and design, and ot
Jan 1, 1995
-
Using Commodity Price Projections In Mineral Project Valuation (e14ad808-00f6-41c6-a874-e60c8a10a41d)By G. Davis
It is well known that the anticipated mineral price at the start of a prospective mineral project can have an overwhelming effect on a property's ex ante value. However, possible price movements
Jan 1, 1995
-
Dry Beneficiation of High Silica Blue Dust –Turning Waste to WealthBy G. E. Sreedhar, R. Kumar
The pockets of high silica blue dust across the entire high grade hematite deposits in the Bailadila sector bothers the excavation activity due their iron content, which is higher than the threshold v
Jan 1, 2019
-
Impact of ROM PSD on the Crushing and Grinding Circuit Throughput (5e431dad-45a4-40b9-8584-42f15d06d837)By J. Kemeny, R. Fuentealba, C. Rodriguez, F. Fernandez, M. Rocha, T. BoBo
"Mathematical modeling in conjunction with mineral characterization is widely used as a method for design and optimization of comminution circuits, to simulate the processes of crushing, grinding and
Jan 1, 2015
-
The New Cable Way on the Mont Blanc in Italy: Underground Construction at High AltitudesBy Cancelli Paolo, Bragonzi Gianluca, Pelizza Sebastiano
"In May 2015 the New Monte Bianco aerial cableway, operating on the Italian side, have been completed. It connects the lower station in Pontal d’Entreves (1300 metres above sea level (m a.s.l.)) with